|
|
LITEON 1MBd, bipolar
LITEON 6N136S-TA1-H
- 6N136S-TA1-H
- LITEON
-
1:
Rp20.548
-
4.000In Stock
-
New At Mouser
|
Mouser Part No
859-6N136S-TA1-H
New At Mouser
|
LITEON
|
LITEON 1MBd, bipolar
|
|
4.000In Stock
|
|
Min.: 1
Mult.: 1
:
1.000
|
|
|
|
|
LITEON Darlington
LITEON 6N138S-TA1-L
- 6N138S-TA1-L
- LITEON
-
1:
Rp23.666
-
3.989In Stock
-
New At Mouser
|
Mouser Part No
859-6N138S-TA1-L
New At Mouser
|
LITEON
|
LITEON Darlington
|
|
3.989In Stock
|
|
Min.: 1
Mult.: 1
:
1.000
|
|
|
|
|
LITEON 10MBd, bipolar
LITEON LTV-60LW-TA1
- LTV-60LW-TA1
- LITEON
-
1:
Rp21.465
-
3.970In Stock
-
New At Mouser
|
Mouser Part No
859-LTV-60LW-TA1
New At Mouser
|
LITEON
|
LITEON 10MBd, bipolar
|
|
3.970In Stock
|
|
Min.: 1
Mult.: 1
:
1.000
|
|
|
|
|
LITEON 10MBd, open-drain
LITEON LTV-M601-H
- LTV-M601-H
- LITEON
-
1:
Rp22.749
-
6.000In Stock
-
New At Mouser
|
Mouser Part No
859-LTV-M601-H
New At Mouser
|
LITEON
|
LITEON 10MBd, open-drain
|
|
6.000In Stock
|
|
Min.: 1
Mult.: 1
:
3.000
|
|
|
|
|
LITEON 1MBd, bipolar
LITEON 6N136S-TA1-L
- 6N136S-TA1-L
- LITEON
-
1:
Rp19.814
-
4.000Expected 22/12/2026
-
New At Mouser
|
Mouser Part No
859-6N136S-TA1-L
New At Mouser
|
LITEON
|
LITEON 1MBd, bipolar
|
|
4.000Expected 22/12/2026
|
|
Min.: 1
Mult.: 1
:
1.000
|
|
|
|
|
LITEON 10MBd, bipolar
LITEON 6N137S-TA1-L
- 6N137S-TA1-L
- LITEON
-
1:
Rp23.666
-
4.000Expected 24/11/2026
-
New At Mouser
|
Mouser Part No
859-6N137S-TA1-L
New At Mouser
|
LITEON
|
LITEON 10MBd, bipolar
|
|
4.000Expected 24/11/2026
|
|
Min.: 1
Mult.: 1
:
1.000
|
|
|
|
|
LITEON 3mm green 569nm transparent taped
LITEON LTL-1CHGE-021
- LTL-1CHGE-021
- LITEON
-
27.000:
Rp642
-
Non-Stocked Lead-Time 10 Weeks
|
Mouser Part No
859-LTL-1CHGE-021
|
LITEON
|
LITEON 3mm green 569nm transparent taped
|
|
Non-Stocked Lead-Time 10 Weeks
|
|
Min.: 27.000
Mult.: 1.500
:
1.500
|
|
|
|
|
LITEON 5mm high eff red 623nm diffused taped
LITEON LTL-307E-002
- LTL-307E-002
- LITEON
-
24.000:
Rp715
-
Non-Stocked Lead-Time 10 Weeks
|
Mouser Part No
859-LTL-307E-002
|
LITEON
|
LITEON 5mm high eff red 623nm diffused taped
|
|
Non-Stocked Lead-Time 10 Weeks
|
|
Min.: 24.000
Mult.: 2.000
:
2.000
|
|
|
|
|
LITEON 5mm high eff red 623nm transparent taped
LITEON LTL-307EE-002
- LTL-307EE-002
- LITEON
-
26.000:
Rp679
-
Non-Stocked Lead-Time 10 Weeks
|
Mouser Part No
859-LTL-307EE-002
|
LITEON
|
LITEON 5mm high eff red 623nm transparent taped
|
|
Non-Stocked Lead-Time 10 Weeks
|
|
Min.: 26.000
Mult.: 2.000
:
2.000
|
|
|
|
|
LITEON 5mm green 569nm diffused taped
LITEON LTL-307G-002
- LTL-307G-002
- LITEON
-
20.000:
Rp1.082
-
Non-Stocked Lead-Time 10 Weeks
|
Mouser Part No
859-LTL-307G-002
|
LITEON
|
LITEON 5mm green 569nm diffused taped
|
|
Non-Stocked Lead-Time 10 Weeks
|
|
Min.: 20.000
Mult.: 2.000
:
2.000
|
|
|
|
|
LITEON 5mm green 569nm transparent taped
LITEON LTL-307GE-002
- LTL-307GE-002
- LITEON
-
20.000:
Rp1.082
-
Non-Stocked Lead-Time 10 Weeks
|
Mouser Part No
859-LTL-307GE-002
|
LITEON
|
LITEON 5mm green 569nm transparent taped
|
|
Non-Stocked Lead-Time 10 Weeks
|
|
Min.: 20.000
Mult.: 2.000
:
2.000
|
|
|
|
|
LITEON 5mm green/red orange 621/569 w'diffused taped
LITEON LTL-30EHJ-012
- LTL-30EHJ-012
- LITEON
-
14.000:
Rp1.596
-
Non-Stocked Lead-Time 10 Weeks
|
Mouser Part No
859-LTL-30EHJ-012
|
LITEON
|
LITEON 5mm green/red orange 621/569 w'diffused taped
|
|
Non-Stocked Lead-Time 10 Weeks
|
|
Min.: 14.000
Mult.: 2.000
:
2.000
|
|
|
|
|
LITEON 3mm bright red 657nm diffused small flange taped
LITEON LTL-4211N-022
- LTL-4211N-022
- LITEON
-
33.000:
Rp550
-
Non-Stocked Lead-Time 10 Weeks
|
Mouser Part No
859-LTL-4211N-022
|
LITEON
|
LITEON 3mm bright red 657nm diffused small flange taped
|
|
Non-Stocked Lead-Time 10 Weeks
|
|
Min.: 33.000
Mult.: 1.500
:
1.500
|
|
|
|
|
LITEON 3mm high eff red 623nm diffused small flange taped
LITEON LTL-4221N-011
- LTL-4221N-011
- LITEON
-
25.500:
Rp660
-
Non-Stocked Lead-Time 10 Weeks
|
Mouser Part No
859-LTL-4221N-011
|
LITEON
|
LITEON 3mm high eff red 623nm diffused small flange taped
|
|
Non-Stocked Lead-Time 10 Weeks
|
|
Min.: 25.500
Mult.: 1.500
:
1.500
|
|
|
|
|
LITEON 3mm high eff red 623nm diffused small flange taped
LITEON LTL-4221N-022
- LTL-4221N-022
- LITEON
-
1:
Rp5.687
-
Non-Stocked Lead-Time 10 Weeks
|
Mouser Part No
859-LTL-4221N-022
|
LITEON
|
LITEON 3mm high eff red 623nm diffused small flange taped
|
|
Non-Stocked Lead-Time 10 Weeks
|
|
Min.: 1
Mult.: 1
:
1.500
|
|
|
|
|
LITEON 5mm high eff red 623nm diffused taped
LITEON LTL-4223-021
- LTL-4223-021
- LITEON
-
26.000:
Rp679
-
Non-Stocked Lead-Time 10 Weeks
|
Mouser Part No
859-LTL-4223-021
|
LITEON
|
LITEON 5mm high eff red 623nm diffused taped
|
|
Non-Stocked Lead-Time 10 Weeks
|
|
Min.: 26.000
Mult.: 2.000
:
2.000
|
|
|
|
|
LITEON 5mm high eff red 623nm transparent taped
LITEON LTL-4224-012
- LTL-4224-012
- LITEON
-
24.000:
Rp697
-
Non-Stocked Lead-Time 10 Weeks
|
Mouser Part No
859-LTL-4224-012
|
LITEON
|
LITEON 5mm high eff red 623nm transparent taped
|
|
Non-Stocked Lead-Time 10 Weeks
|
|
Min.: 24.000
Mult.: 2.000
:
2.000
|
|
|
|
|
LITEON 3mm green 569nm diffused small flange taped
LITEON LTL-4231N-011
- LTL-4231N-011
- LITEON
-
24.000:
Rp697
-
Non-Stocked Lead-Time 10 Weeks
|
Mouser Part No
859-LTL-4231N-011
|
LITEON
|
LITEON 3mm green 569nm diffused small flange taped
|
|
Non-Stocked Lead-Time 10 Weeks
|
|
Min.: 24.000
Mult.: 1.500
:
1.500
|
|
|
|
|
LITEON 5mm green 569nm transparent taped
LITEON LTL-4234-011
- LTL-4234-011
- LITEON
-
26.000:
Rp660
-
Non-Stocked Lead-Time 10 Weeks
|
Mouser Part No
859-LTL-4234-011
|
LITEON
|
LITEON 5mm green 569nm transparent taped
|
|
Non-Stocked Lead-Time 10 Weeks
|
|
Min.: 26.000
Mult.: 2.000
:
2.000
|
|
|
|
|
LITEON 3mm yellow 588nm diffused small flange taped
LITEON LTL-4251N-002
- LTL-4251N-002
- LITEON
-
25.500:
Rp679
-
Non-Stocked Lead-Time 10 Weeks
|
Mouser Part No
859-LTL-4251N-002
|
LITEON
|
LITEON 3mm yellow 588nm diffused small flange taped
|
|
Non-Stocked Lead-Time 10 Weeks
|
|
Min.: 25.500
Mult.: 1.500
:
1.500
|
|
|
|
|
LITEON 3mm yellow 588nm diffused small flange taped
LITEON LTL-4251N-011
- LTL-4251N-011
- LITEON
-
25.500:
Rp679
-
Non-Stocked Lead-Time 10 Weeks
|
Mouser Part No
859-LTL-4251N-011
|
LITEON
|
LITEON 3mm yellow 588nm diffused small flange taped
|
|
Non-Stocked Lead-Time 10 Weeks
|
|
Min.: 25.500
Mult.: 1.500
:
1.500
|
|
|
|
|
LITEON 3mm yellow 588nm diffused small flange taped
LITEON LTL-4251N-022
- LTL-4251N-022
- LITEON
-
25.500:
Rp679
-
Non-Stocked Lead-Time 10 Weeks
|
Mouser Part No
859-LTL-4251N-022
|
LITEON
|
LITEON 3mm yellow 588nm diffused small flange taped
|
|
Non-Stocked Lead-Time 10 Weeks
|
|
Min.: 25.500
Mult.: 1.500
:
1.500
|
|
|
|
|
LITEON 3mm AlGaAs red 638nm diffused taped
LITEON LTL-4261NR-022
- LTL-4261NR-022
- LITEON
-
16.500:
Rp1.266
-
Non-Stocked Lead-Time 12 Weeks
|
Mouser Part No
859-LTL-4261NR-022
|
LITEON
|
LITEON 3mm AlGaAs red 638nm diffused taped
|
|
Non-Stocked Lead-Time 12 Weeks
|
|
Min.: 16.500
Mult.: 1.500
:
1.500
|
|
|
|
|
LITEON 5x2mm green 569nm diffused taped
LITEON LTL-433G-012
- LTL-433G-012
- LITEON
-
22.500:
Rp954
-
Non-Stocked Lead-Time 10 Weeks
|
Mouser Part No
859-LTL-433G-012
|
LITEON
|
LITEON 5x2mm green 569nm diffused taped
|
|
Non-Stocked Lead-Time 10 Weeks
|
|
Min.: 22.500
Mult.: 1.500
:
1.500
|
|
|
|
|
LITEON LAMP LTL1CHKRKNN-002A TAPING REEL
LITEON LTL1CHKRKNN-002A
- LTL1CHKRKNN-002A
- LITEON
-
15.000:
Rp1.303
-
Non-Stocked Lead-Time 12 Weeks
|
Mouser Part No
859-LTL1CHKRKNN-002A
|
LITEON
|
LITEON LAMP LTL1CHKRKNN-002A TAPING REEL
|
|
Non-Stocked Lead-Time 12 Weeks
|
|
Min.: 15.000
Mult.: 1.000
:
1.000
|
|
|