All Results (1.253)

Filters

Availability options
Select Image Part # Mfr. Description Datasheet Availability Pricing (IDR) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Cynergy3 Reed Relays RR C/O 24V coil w/screen Non-Stocked Lead-Time 10 Weeks
Rp848.869,42
Rp808.141,30
Rp772.550,06
Rp747.416,04
Min.: 1
Mult.: 1
Cynergy3 Reed Relays 5kV 05V SPNO Rhodium - Flying Lead HV contact connections - HR Non-Stocked Lead-Time 10 Weeks
Rp932.527,18
Rp878.589,94
Min.: 20
Mult.: 20
Cynergy3 Reed Relays SPST n/o 5kV Isolation 5V Coil (Flying Lead) UL Non-Stocked Lead-Time 10 Weeks
Rp905.742,02
Rp879.140,32
Min.: 20
Mult.: 20
Cynergy3 Level Sensors - Industrial Deep Level Finder 200M cable Non-Stocked Lead-Time 8 Weeks
Rp17.130.210,58
Rp16.314.547,42
Min.: 1
Mult.: 1
Cynergy3 Sensor Fixings & Accessories G1/8 (BSP) 250mm long extension tube Non-Stocked Lead-Time 10 Weeks
Rp1.840.103,80
Rp1.743.053,46
Rp1.663.798,74
Rp1.584.727,48
Min.: 1
Mult.: 1
Cynergy3 Sensor Fixings & Accessories G3/8 (BSP) 250mm long extension tube Non-Stocked Lead-Time 10 Weeks
Rp2.199.135,02
Rp2.175.468,68
Rp2.101.350,84
Rp2.027.783,38
Min.: 1
Mult.: 1
Cynergy3 Sensor Fixings & Accessories M16 250mm long extension tube Non-Stocked Lead-Time 10 Weeks
Rp811.810,50
Rp722.282,02
Rp713.842,86
Rp664.125,20
Min.: 1
Mult.: 1
Cynergy3 Sensor Fixings & Accessories M16 250mm long extension tube Non-Stocked Lead-Time 10 Weeks
Rp2.005.951,64
Rp1.910.919,36
Rp1.823.959,32
Rp1.802.494,50
Min.: 1
Mult.: 1
Cynergy3 Sensor Fixings & Accessories G1/8 (BSP) 500mm long extension tube Non-Stocked Lead-Time 10 Weeks
Rp2.431.395,38
Rp2.309.211,02
Rp2.184.825,14
Rp2.023.563,80
Min.: 1
Mult.: 1
Cynergy3 Sensor Fixings & Accessories G3/8 (BSP) 500mm long extension tube Non-Stocked Lead-Time 10 Weeks
Rp2.552.478,98
Rp2.502.577,86
Rp2.410.847,86
Min.: 1
Mult.: 1
Cynergy3 Sensor Fixings & Accessories M16 500mm long extension tube Non-Stocked Lead-Time 10 Weeks
Rp799.518,68
Rp780.071,92
Rp731.271,56
Rp689.259,22
Min.: 1
Mult.: 1
Cynergy3 Sensor Fixings & Accessories M16 500mm long extension tube Non-Stocked Lead-Time 10 Weeks
Rp2.432.863,06
Rp2.238.395,46
Rp2.158.406,90
Rp2.103.185,44
Min.: 1
Mult.: 1
Cynergy3 Sensor Fixings & Accessories G1/8 (BSP) 750mm long extension tube Non-Stocked Lead-Time 10 Weeks
Rp2.465.885,86
Rp2.269.033,28
Rp2.187.760,50
Rp2.131.805,20
Min.: 1
Mult.: 1
Cynergy3 Sensor Fixings & Accessories G3/8 (BSP) 750mm long extension tube Non-Stocked Lead-Time 10 Weeks
Rp2.799.966,52
Rp2.576.328,78
Rp2.484.231,86
Min.: 1
Mult.: 1
Cynergy3 Sensor Fixings & Accessories M12 750mm long extension tube Non-Stocked Lead-Time 10 Weeks
Rp993.252,44
Rp891.248,68
Rp845.016,76
Min.: 1
Mult.: 1
Cynergy3 Sensor Fixings & Accessories M16 750mm long extension tube Non-Stocked Lead-Time 10 Weeks
Rp909.778,14
Rp867.031,96
Rp836.210,68
Rp815.479,70
Min.: 1
Mult.: 1
Cynergy3 Sensor Fixings & Accessories G1/8 (BSP) 1000mm long extension tube Non-Stocked Lead-Time 10 Weeks
Rp2.657.968,48
Rp2.531.564,54
Rp2.467.537,00
Min.: 1
Mult.: 1
Cynergy3 Sensor Fixings & Accessories G3/8 (BSP) 1000mm long extension tube Non-Stocked Lead-Time 10 Weeks
Rp2.977.922,72
Rp2.836.108,14
Rp2.745.845,82
Min.: 1
Mult.: 1
Cynergy3 Sensor Fixings & Accessories Pump controller - pressure Non-Stocked Lead-Time 10 Weeks
Rp4.994.698,50
Rp4.756.383,96
Min.: 1
Mult.: 1
Cynergy3 Sensor Fixings & Accessories Chamber switch vented Non-Stocked Lead-Time 10 Weeks
Rp7.259.695,66
Rp6.913.873,56
Min.: 1
Mult.: 1
Cynergy3 Sensor Fixings & Accessories Chamber switch unvented Non-Stocked Lead-Time 10 Weeks
Rp7.259.695,66
Rp6.919.744,28
Min.: 1
Mult.: 1
Cynergy3 Sensor Fixings & Accessories Thermal cutout for dry running Non-Stocked Lead-Time 10 Weeks
Rp1.154.880,70
Rp1.100.393,08
Rp1.050.125,04
Rp1.019.120,30
Min.: 1
Mult.: 1
Cynergy3 Level Sensors - Industrial SPNO, 10Amp switch with PVC cable & protective earth Non-Stocked Lead-Time 10 Weeks
Rp3.944.756,92
Rp3.757.260,80
Rp3.616.546,98
Min.: 1
Mult.: 1
Cynergy3 Level Sensors - Industrial SPNO, 10Amp switch with PUR cable, for diesel etc.& protective earth Non-Stocked Lead-Time 10 Weeks
Rp5.601.767,64
Min.: 1
Mult.: 1
Cynergy3 Level Sensors - Industrial SPNO, 10Amp switch with PVC cable & protective earth WRAS approved Non-Stocked Lead-Time 10 Weeks
Rp4.609.249,04
Rp4.390.197,80
Rp4.228.936,46
Min.: 1
Mult.: 1