All Results (1.253)

Filters

Availability options
Select Image Part # Mfr. Description Datasheet Availability Pricing (IDR) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Cynergy3 Sensor Fixings & Accessories Cable PUR with straight M12 connector 10M Non-Stocked Lead-Time 10 Weeks
Rp1.474.284,56
Rp1.403.469,00
Rp1.339.624,92
Rp1.300.181,02
Min.: 1
Mult.: 1
Cynergy3 Sensor Fixings & Accessories Cable PVC with straight M12 connector 10M Non-Stocked Lead-Time 10 Weeks
Rp1.217.257,10
Rp1.211.386,38
Rp1.190.105,02
Min.: 20
Mult.: 20
Cynergy3 Level Sensors - Industrial Switch, EXia, cable end, 10m Non-Stocked Lead-Time 10 Weeks
Rp4.973.967,52
Rp4.737.304,12
Min.: 1
Mult.: 1
Cynergy3 Level Sensors - Industrial Switch, EXia, cable end, 20m Non-Stocked Lead-Time 10 Weeks
Rp7.460.951,28
Rp7.105.589,26
Min.: 1
Mult.: 1
Cynergy3 Level Sensors - Industrial Switch, EXia, cable end, 5m Non-Stocked Lead-Time 10 Weeks
Rp3.989.337,70
Rp3.553.253,28
Min.: 1
Mult.: 1
Cynergy3 Level Sensors Int Low level float switch, 100VA, Nylon, 1m PVC 16/0.2, nitrile gasket Non-Stocked Lead-Time 10 Weeks
Rp757.322,88
Rp721.181,26
Rp688.708,84
Rp668.528,24
Min.: 1
Mult.: 1
Cynergy3 Level Sensors Int Low level float switch, 100VA, Nylon, M12, nitrile gasket Non-Stocked Lead-Time 10 Weeks
Rp711.641,34
Rp677.884,70
Rp646.696,50
Rp632.203,16
Min.: 1
Mult.: 1
Cynergy3 Level Sensors Int Low level float switch, 25VA, Nylon, 1m PVC 16/0.2, nitrile gasket Non-Stocked Lead-Time 8 Weeks
Rp605.601,46
Rp577.165,16
Rp551.297,30
Rp534.969,36
Min.: 1
Mult.: 1
Cynergy3 Level Sensors Int Low level float switch, 25VA, Nylon,M12, nitrile gasket Non-Stocked Lead-Time 8 Weeks
Rp560.653,76
Rp534.052,06
Rp509.651,88
Rp494.791,62
Min.: 1
Mult.: 1
Cynergy3 Level Sensors Int Low level float switch, 100VA, PP, 1m PVC 16/0.2, nitrile gasket Non-Stocked Lead-Time 12 Weeks
Rp799.702,14
Rp761.725,92
Rp727.235,44
Rp706.137,54
Min.: 1
Mult.: 1
Cynergy3 Level Sensors Int Low level float switch, 25VA, PP, 1m PVC 16/0.2, nitrile gasket Non-Stocked Lead-Time 10 Weeks
Rp639.174,64
Rp609.087,20
Rp581.568,20
Rp564.506,42
Min.: 1
Mult.: 1
Cynergy3 Level Sensors Int Low level float switch, 100VA, PPS, 1m PVC 16/0.2, nitrile gasket Non-Stocked Lead-Time 12 Weeks
Rp903.357,04
Rp888.313,32
Rp871.801,92
Rp864.096,60
Min.: 1
Mult.: 1
Cynergy3 Level Sensors Int Low level float switch, 100VA, PPS, M12, nitrile gasket Non-Stocked Lead-Time 12 Weeks
Rp951.056,64
Rp905.742,02
Rp865.013,90
Rp843.732,54
Min.: 1
Mult.: 1
Cynergy3 Level Sensors Int Low level float switch, 25VA, PPS, 1m PVC 16/0.2, nitrile gasket Non-Stocked Lead-Time 8 Weeks
Rp724.300,08
Rp705.403,70
Rp692.194,58
Rp691.093,82
Min.: 1
Mult.: 1
Cynergy3 Level Sensors LLF46YFP Non-Stocked Lead-Time 10 Weeks
Rp680.820,06
Rp649.081,48
Rp619.177,50
Rp600.831,50
Min.: 1
Mult.: 1
Cynergy3 Level Sensors Int Low level float switch, 100VA, PVDF, 1m PTFE 7/0.2, nitrile gasket Non-Stocked Lead-Time 10 Weeks
Rp1.651.690,38
Rp1.572.986,04
Rp1.501.253,18
Rp1.457.039,32
Min.: 1
Mult.: 1
Cynergy3 Level Sensors Int Low level float switch, 100VA, PVDF, 1m PTFE 7/0.2, viton gasket Non-Stocked Lead-Time 10 Weeks
Rp1.651.690,38
Rp1.572.986,04
Rp1.501.253,18
Rp1.457.039,32
Min.: 1
Mult.: 1
Cynergy3 Level Sensors Int Low level float switch, 100VA, PVDF, M12, nitrile gasket Non-Stocked Lead-Time 10 Weeks
Rp1.737.549,66
Rp1.655.176,12
Rp1.579.957,52
Rp1.532.991,76
Min.: 1
Mult.: 1
Cynergy3 Level Sensors Int Low level float switch, 100VA, PVDF, M12, viton gasket Non-Stocked Lead-Time 10 Weeks
Rp1.737.549,66
Rp1.664.165,66
Rp1.647.287,34
Rp1.639.398,56
Min.: 1
Mult.: 1
Cynergy3 Level Sensors Int Low level float switch, 25VA, PVDF, 1m PTFE 7/0.2, nitrile gasket Non-Stocked Lead-Time 8 Weeks
Rp1.325.315,04
Rp1.262.021,34
Rp1.205.148,74
Rp1.169.740,96
Min.: 1
Mult.: 1
Cynergy3 Level Sensors Int Low level float switch, 25VA, PVDF, 1m PTFE 7/0.2, viton gasket Non-Stocked Lead-Time 10 Weeks
Rp1.325.315,04
Rp1.262.021,34
Rp1.205.148,74
Rp1.174.877,84
Min.: 1
Mult.: 1
Cynergy3 Level Sensors Int Low level float switch, 100VA, PVDF, M12, nitrile gasket Non-Stocked Lead-Time 10 Weeks
Rp1.244.592,64
Rp1.192.123,08
Rp1.188.637,34
Rp1.178.913,96
Min.: 1
Mult.: 1
Cynergy3 Level Sensors Int Low level float switch, 25VA, PVDF, M12, viton gasket Non-Stocked Lead-Time 8 Weeks
Rp1.244.592,64
Rp1.185.885,44
Rp1.131.214,36
Rp1.098.375,02
Min.: 1
Mult.: 1
Cynergy3 Level Sensors Int Low level float switch, 100VA, PP(UL), M12, nitrile gasket Non-Stocked Lead-Time 10 Weeks
Rp753.653,68
Rp718.245,90
Rp685.773,48
Rp665.409,42
Min.: 1
Mult.: 1
Cynergy3 Level Sensors Int Low level float switch, 25VA, PP(UL), 1m PVC 16/0.2, nitrile gasket Non-Stocked Lead-Time 8 Weeks
Rp639.174,64
Rp638.991,18
Rp638.073,88
Rp637.523,50
Min.: 1
Mult.: 1