All Results (1.253)

Filters

Availability options
Select Image Part # Mfr. Description Datasheet Availability Pricing (IDR) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Cynergy3 Level Sensors - Industrial SPNC, 10Amp Switch with 5M PVC cable WRAS Non-Stocked Lead-Time 10 Weeks
Rp4.609.249,04
Rp4.390.197,80
Rp4.224.533,42
Min.: 1
Mult.: 1
Cynergy3 Level Sensors - Industrial SPCO, 10Amp Switch with 5M PVC cable WRAS Non-Stocked Lead-Time 10 Weeks
Rp4.609.249,04
Rp4.390.197,80
Rp4.190.226,40
Min.: 1
Mult.: 1
Cynergy3 Level Sensors - Industrial High temp cable float 80 deg PU N/O Non-Stocked Lead-Time 10 Weeks
Rp4.454.041,88
Rp4.241.411,74
Rp4.049.145,66
Min.: 1
Mult.: 1
Cynergy3 Level Sensors - Industrial LEVEL SENSORS - INDUSTRIAL Non-Stocked Lead-Time 12 Weeks
Rp5.517.926,42
Rp5.254.661,32
Min.: 1
Mult.: 1
Cynergy3 Level Sensors - Industrial High temp cable float 130 deg Silicone N/C Non-Stocked Lead-Time 10 Weeks
Rp5.517.926,42
Min.: 1
Mult.: 1
Cynergy3 Level Sensors Switch, autoclave level, 1" access, 3m Non-Stocked Lead-Time 10 Weeks
Rp5.878.058,40
Rp5.831.092,64
Min.: 1
Mult.: 1
Cynergy3 Level Sensors Switch, autoclave level, 1" access, 5m Non-Stocked Lead-Time 10 Weeks
Rp6.423.851,90
Rp6.117.840,62
Min.: 1
Mult.: 1
Cynergy3 Level Sensors - Industrial SPNO, 10Amp switch, 5m PVC 3-core cable, protective earth Non-Stocked Lead-Time 10 Weeks
Rp1.020.771,44
Rp972.521,46
Rp928.307,60
Rp901.155,52
Min.: 1
Mult.: 1
Cynergy3 Level Sensors - Industrial SPNO, 10Amp switch, 5m Polyurethane 3-core cable, protective earth Non-Stocked Lead-Time 10 Weeks
Rp2.599.261,28
Rp2.475.792,70
Rp2.371.770,88
Min.: 1
Mult.: 1
Cynergy3 Level Sensors - Industrial SPNO, 10Amp switch, 5m PVC 3-core cable, protective earth WRAS approved Non-Stocked Lead-Time 10 Weeks
Rp1.683.245,50
Rp1.602.890,02
Rp1.529.689,48
Rp1.484.925,24
Min.: 1
Mult.: 1
Cynergy3 Level Sensors - Industrial SPNC, 10Amp switch, 5m PVC 3-core cable, protective earth Non-Stocked Lead-Time 10 Weeks
Rp1.020.771,44
Rp972.521,46
Rp928.307,60
Rp901.155,52
Min.: 1
Mult.: 1
Cynergy3 Level Sensors - Industrial SPNC, 10Amp switch, 5m Polyurethane 3-core cable, protective earth Non-Stocked Lead-Time 10 Weeks
Rp2.599.261,28
Rp2.481.296,50
Rp2.447.356,40
Min.: 1
Mult.: 1
Cynergy3 Level Sensors - Industrial SPNC, 10Amp switch, 5m PVC 3-core cable, protective earth WRAS approved Non-Stocked Lead-Time 10 Weeks
Rp1.683.245,50
Rp1.602.890,02
Rp1.529.689,48
Rp1.507.307,36
Min.: 1
Mult.: 1
Cynergy3 Level Sensors - Industrial SPCO, 10Amp switch, 5m Polyurethane 3-core cable Non-Stocked Lead-Time 10 Weeks
Rp2.599.261,28
Rp2.475.792,70
Rp2.408.646,34
Min.: 1
Mult.: 1
Cynergy3 Level Sensors - Industrial SPCO, 10Amp switch, 5m PVC 3-core cable, WRAS approved Non-Stocked Lead-Time 10 Weeks
Rp1.683.245,50
Rp1.602.890,02
Rp1.557.575,40
Rp1.539.045,94
Min.: 1
Mult.: 1
Cynergy3 Level Sensors - Industrial SPNO, 20Amp switch, 5m PVC 3-core cable, protective earth WRAS approved Non-Stocked Lead-Time 10 Weeks
Rp1.878.446,94
Rp1.743.787,30
Rp1.715.901,38
Rp1.687.465,08
Min.: 1
Mult.: 1
Cynergy3 Level Sensors - Industrial SPNC, 20Amp switch, 5m PVC 3-core cable, protective earth Non-Stocked Lead-Time 10 Weeks
Rp1.110.116,46
Rp1.057.463,44
Rp1.037.466,30
Rp1.024.807,56
Min.: 1
Mult.: 1
Cynergy3 Level Sensors - Industrial SPNC, 20Amp switch, 5m Polyurethane 3-core cable, protective earth Non-Stocked Lead-Time 10 Weeks
Rp2.683.836,34
Rp2.556.515,10
Rp2.485.149,16
Min.: 1
Mult.: 1
Cynergy3 Level Sensors - Industrial SPNO, 20Amp switch, 5m PVC 3-core cable, protective earth WRAS approved Non-Stocked Lead-Time 10 Weeks
Rp1.831.481,18
Rp1.743.787,30
Rp1.668.752,16
Rp1.648.021,18
Min.: 1
Mult.: 1
Cynergy3 Level Sensors - Industrial SPCO, 20Amp switch, 5m Polyurethane 3-core cable Non-Stocked Lead-Time 10 Weeks
Rp2.683.836,34
Rp2.556.515,10
Rp2.440.201,46
Min.: 1
Mult.: 1
Cynergy3 Level Sensors - Industrial SPNO, 20Amp switch, 5m PVC 3-core cable, protective earth WRAS approved Non-Stocked Lead-Time 10 Weeks
Rp1.977.331,88
Rp1.743.787,30
Min.: 1
Mult.: 1
Cynergy3 Level Sensors LLS Non-Stocked Lead-Time 10 Weeks
Rp1.070.489,10
Rp1.019.303,76
Rp973.438,76
Rp945.002,46
Min.: 1
Mult.: 1
Cynergy3 Level Sensors Vertical, Ext Mount, Nylon, N/O, 100VA Non-Stocked Lead-Time 10 Weeks
Rp624.681,30
Rp585.971,24
Rp561.387,60
Rp556.250,72
Min.: 1
Mult.: 1
Cynergy3 Level Sensors Vertical, Ext Mount, Nylon, N/O, 100VA, M12 Plug Non-Stocked Lead-Time 10 Weeks
Rp611.105,26
Rp571.477,90
Rp535.886,66
Rp531.483,62
Min.: 1
Mult.: 1
Cynergy3 Level Sensors Vertical, Ext Mount, Nylon, N/O, 25VA, M12 Plug Non-Stocked Lead-Time 8 Weeks
Rp457.549,24
Rp435.717,50
Rp415.353,44
Rp403.245,08
Min.: 1
Mult.: 1