QFN-22 Semiconductors

Results: 67
Select Image Part # Mfr. Description Datasheet Availability Pricing (IDR) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Monolithic Power Systems (MPS) Switching Voltage Regulators 3A, 36V, Step-Down Converter with Single Channel USB Charging Port Supporting QC3.0 and Type-C 5V@3A DFP Mode for Automotive, AEC-Q100 Qualified Non-Stocked Lead-Time 71 Weeks
Reel
Rp33.756,64
Min.: 5.000
Mult.: 5.000
: 5.000
Monolithic Power Systems (MPS) Switching Voltage Regulators 3A, 36V, Step-Down Converter with USB Charging Port Supporting CDP and Type-C 5V @ 3A DFP Mode, AEC-Q100 Qualified Non-Stocked Lead-Time 71 Weeks
Cut Tape
Rp66.045,60
Rp49.534,20
Rp45.314,62
Rp40.728,12
Reel
Rp33.756,64
Min.: 1
Mult.: 1
: 5.000
Monolithic Power Systems (MPS) Switching Voltage Regulators 3A, 36V, Step-Down Converter with USB Charging Port Supporting CDP and Type-C 5V @ 3A DFP Mode, AEC-Q100 Qualified Non-Stocked Lead-Time 78 Weeks
Cut Tape
Rp73.200,54
Rp54.854,54
Rp50.268,04
Rp45.314,62
Rp42.929,64
Reel
Rp39.627,36
Min.: 1
Mult.: 1
: 500
Monolithic Power Systems (MPS) Switching Voltage Regulators 5A, 36V, Fully Integrated USB PD3.1 Solution with Integrated Buck-Boost Converter, AEC-Q100 Qualified Non-Stocked Lead-Time 50 Weeks
Cut Tape
Rp75.402,06
Rp56.872,60
Rp52.286,10
Rp47.149,22
Reel
Rp40.728,12
Min.: 1
Mult.: 1
: 5.000
Monolithic Power Systems (MPS) Switching Voltage Regulators 5A, 36V, Fully Integrated USB PD Solution with Integrated Buck-Boost Converter, AEC-Q100 Qualified Non-Stocked Lead-Time 50 Weeks
Reel
Rp40.728,12
Min.: 5.000
Mult.: 5.000
: 5.000
Monolithic Power Systems (MPS) Switching Voltage Regulators 5A, 36V, Fully Integrated USB PD Solution with Integrated Buck-Boost Converter, AEC-Q100 Qualified Non-Stocked Lead-Time 50 Weeks
Reel
Rp44.764,24
Min.: 5.000
Mult.: 5.000
: 5.000
Monolithic Power Systems (MPS) Switching Voltage Regulators 5A, 36V, Fully Integrated USB PD Solution with Integrated Buck-Boost Converter, AEC-Q100 Qualified Non-Stocked Lead-Time 50 Weeks
Reel
Rp40.728,12
Min.: 5.000
Mult.: 5.000
: 5.000
Monolithic Power Systems (MPS) Hot Swap Voltage Controllers 28V, 6A, 7mO RDS(ON) Hot-Swap Protection Device with Current Monitoring,AEC-Q100 Qualified Non-Stocked Lead-Time 71 Weeks
Cut Tape
Rp92.096,92
Rp69.714,80
Rp64.027,54
Rp57.973,36
Reel
Rp48.433,44
Min.: 1
Mult.: 1
: 5.000
Monolithic Power Systems (MPS) Hot Swap Voltage Controllers 28V, 8A, 7mO RDS(ON) Hot-Swap Protection Device with Current Monitoring,AEC-Q100 Qualified Non-Stocked Lead-Time 71 Weeks
Reel
Rp54.854,54
Min.: 5.000
Mult.: 5.000
: 5.000
Monolithic Power Systems (MPS) Switching Voltage Regulators 17A 8V 600kHz Boost Conv Prg UVLO Ext SS Non-Stocked Lead-Time 57 Weeks
Reel
Rp61.092,18
Min.: 5.000
Mult.: 5.000
: 5.000
Monolithic Power Systems (MPS) Switching Voltage Regulators 17A 20V 600kHz Boost Conv Prg UVLO Ext SS Non-Stocked Lead-Time 57 Weeks
Reel
Rp59.074,12
Min.: 5.000
Mult.: 5.000
: 5.000
Monolithic Power Systems (MPS) Hot Swap Voltage Controllers 12V, 7m RDSon Hot Swap Protection Non-Stocked Lead-Time 71 Weeks
Reel
Rp58.707,20
Min.: 500
Mult.: 500
: 500
Monolithic Power Systems (MPS) Hot Swap Voltage Controllers 12V, 7m RDSon Hot Swap Protection Non-Stocked Lead-Time 64 Weeks
Reel
Rp54.671,08
Min.: 5.000
Mult.: 5.000
: 5.000
Monolithic Power Systems (MPS) MP1922GV-Z
Monolithic Power Systems (MPS) Motor/Motion/Ignition Controllers & Drivers 100V Half-Bridge Pre-Driver Non-Stocked Lead-Time 30 Weeks
Reel
Rp27.152,08
Min.: 5.000
Mult.: 5.000
: 5.000
Monolithic Power Systems (MPS) MPQ1922GV-AEC1-Z
Monolithic Power Systems (MPS) Motor/Motion/Ignition Controllers & Drivers 100V Half-Bridge Pre-Driver Non-Stocked Lead-Time 37 Weeks
Reel
Rp37.425,84
Min.: 5.000
Mult.: 5.000
: 5.000
Monolithic Power Systems (MPS) MPQ1922GVE-AEC1-P
Monolithic Power Systems (MPS) Motor/Motion/Ignition Controllers & Drivers 100V Half-Bridge Pre-Driver Non-Stocked Lead-Time 44 Weeks
Reel
Rp44.580,78
Min.: 500
Mult.: 500
: 500
Monolithic Power Systems (MPS) MPQ1922GVE-AEC1-Z
Monolithic Power Systems (MPS) Motor/Motion/Ignition Controllers & Drivers 100V Half-Bridge Pre-Driver Non-Stocked Lead-Time 37 Weeks
Reel
Rp37.242,38
Min.: 5.000
Mult.: 5.000
: 5.000