Electronic Components

Industrial Automation

Filters

Availability options

Applied filters

Select Image Part # Mfr. Description Datasheet Availability Pricing (IDR) Filter the results in the table by unit price based on your quantity. Qty. RoHS
C&K Basic / Snap Action Switches Non-Stocked Lead-Time 16 Weeks
Rp121.817,44
Rp100.903,00
Rp93.564,60
Rp88.244,26
Min.: 1
Mult.: 1
C&K Basic / Snap Action Switches Non-Stocked Lead-Time 16 Weeks
Rp44.030,40
Min.: 1.500
Mult.: 300
C&K Basic / Snap Action Switches Non-Stocked Lead-Time 16 Weeks
Rp75.218,60
Rp72.650,16
Min.: 500
Mult.: 50
C&K Basic / Snap Action Switches SWITCH ZPA00A080L04T Non-Stocked Lead-Time 16 Weeks
Reel
Rp64.577,92
Rp62.192,94
Min.: 400
Mult.: 400
: 400
TE Connectivity / Alcoswitch Basic / Snap Action Switches UMINSA SW PPLUN0.74N 0.1A/30VDC NC PCB Non-Stocked Lead-Time 19 Weeks
Rp16.804,94
Rp16.236,21
Min.: 1.000
Mult.: 500
TE Connectivity / Alcoswitch Basic / Snap Action Switches UMINSA SW PPLUN0.74N 0.1A/30VDC NO PCB Non-Stocked Lead-Time 19 Weeks
Rp22.565,58
Rp21.464,82
Rp20.547,52
Rp19.813,68
Min.: 1
Mult.: 1
TE Connectivity / Alcoswitch Basic / Snap Action Switches UMINSA SW PPLUN0.88N 3A/1.5A AC SC PCB Non-Stocked Lead-Time 19 Weeks
Rp16.603,13
Rp16.052,75
Min.: 1.000
Mult.: 500
TE Connectivity / Alcoswitch Basic / Snap Action Switches UMINSA SW PPLUN0.88N 3A/1.5A AC NC PCB Non-Stocked Lead-Time 19 Weeks
Rp28.803,22
Rp27.335,54
Rp26.051,32
Rp24.950,56
Min.: 1
Mult.: 1
TE Connectivity / Alcoswitch Basic / Snap Action Switches UMINSA SW PPLUN0.88N 3A/1.5A AC NO PCB Non-Stocked Lead-Time 19 Weeks
Rp16.401,32
Rp15.740,87
Min.: 1.000
Mult.: 500
TE Connectivity / Alcoswitch Basic / Snap Action Switches UMINSA SW HLEV 0.74N 0.1A/30VDC SC PCB Non-Stocked Lead-Time 19 Weeks
Rp22.749,04
Rp21.648,28
Rp20.730,98
Rp17.850,66
Min.: 1
Mult.: 1
TE Connectivity / Alcoswitch Basic / Snap Action Switches UMINSA SW HLEV 0.74N 0.1A/30VDC NC PCB Non-Stocked Lead-Time 19 Weeks
Rp23.666,34
Rp22.565,58
Rp21.464,82
Rp20.730,98
Min.: 1
Mult.: 1
TE Connectivity / Alcoswitch Basic / Snap Action Switches UMINSA SW HLEV 0.74N 0.1A/30VDC NO PCB Non-Stocked Lead-Time 19 Weeks
Rp23.115,96
Rp21.831,74
Rp20.914,44
Rp19.997,14
Min.: 1
Mult.: 1
TE Connectivity / Alcoswitch Basic / Snap Action Switches UMINSA SW HLV0.88N 3A/1.5A AC NC PCB Non-Stocked Lead-Time 19 Weeks
Rp16.199,52
Rp15.649,14
Min.: 1.000
Mult.: 500
TE Connectivity / Alcoswitch Basic / Snap Action Switches UMINSA SW HLV0.88N 3A/1.5A AC NO PCB Non-Stocked Lead-Time 19 Weeks
Rp16.107,79
Rp15.520,72
Min.: 1.000
Mult.: 500
TE Connectivity / Alcoswitch Basic / Snap Action Switches UMINSA SW BLEV 0.74N 0.1A/30VDC NO PCB Non-Stocked Lead-Time 19 Weeks
Rp23.849,80
Rp22.749,04
Rp21.648,28
Rp18.712,92
Min.: 1
Mult.: 1
TE Connectivity / Alcoswitch Basic / Snap Action Switches UMINSA SW BLV0.88N 3A/1.5A AC SC PCB Non-Stocked Lead-Time 19 Weeks
Rp16.713,21
Rp16.162,83
Min.: 1.000
Mult.: 500
TE Connectivity / Alcoswitch Basic / Snap Action Switches UMINSA SW BLV0.88N 3A/1.5A AC NC PCB Non-Stocked Lead-Time 19 Weeks
Rp15.997,71
Rp15.428,99
Min.: 1.000
Mult.: 500
TE Connectivity / Alcoswitch Basic / Snap Action Switches UMINSA SW BLV0.88N 3A/1.5A AC NO PCB Non-Stocked Lead-Time 19 Weeks
Rp16.474,71
Rp15.942,67
Min.: 1.000
Mult.: 500
TE Connectivity / Alcoswitch Basic / Snap Action Switches UMINSA SW RLEV0.74N 0.1A/30VDC NC PCB Non-Stocked Lead-Time 19 Weeks
Rp24.033,26
Rp22.932,50
Rp21.831,74
Rp21.097,90
Min.: 1
Mult.: 1
TE Connectivity / Alcoswitch Basic / Snap Action Switches UMINSA SW RLEV0.74N 0.1A/30VDC NO PCB Non-Stocked Lead-Time 19 Weeks
Rp23.849,80
Rp22.565,58
Rp21.648,28
Rp18.712,92
Min.: 1
Mult.: 1
TE Connectivity / Alcoswitch Basic / Snap Action Switches UMINSA SW RLEV0.88N 3A/1.5A AC SC PCB Non-Stocked Lead-Time 19 Weeks
Rp16.419,67
Rp15.832,60
Min.: 1.000
Mult.: 500
TE Connectivity / Alcoswitch Basic / Snap Action Switches UMINSA SW RLEV0.88N 3A/1.5A AC NC PCB Non-Stocked Lead-Time 19 Weeks
Rp16.511,40
Rp16.034,40
Min.: 1.000
Mult.: 500
TE Connectivity / Alcoswitch Basic / Snap Action Switches SMINSA SW PPL 1.47N 5A/3A AC 3A DC SP Non-Stocked Lead-Time 19 Weeks
Rp21.831,74
Rp21.097,90
Min.: 1.000
Mult.: 100
TE Connectivity / Alcoswitch Basic / Snap Action Switches SMIN SW 18UPLV 1.47N 5A/3A AC 3A DC SP Non-Stocked Lead-Time 19 Weeks
Rp17.832,31
Rp17.245,24
Min.: 1.000
Mult.: 100
TE Connectivity / Alcoswitch Basic / Snap Action Switches SMINSA SW PPL 0.49N. 5A AC DT SLD Non-Stocked Lead-Time 19 Weeks
Rp52.102,64
Min.: 1.000
Mult.: 50