Electronic Components

Industrial Automation

Filters

Availability options

Applied filters

Select Image Part # Mfr. Description Datasheet Availability Pricing (IDR) Filter the results in the table by unit price based on your quantity. Qty. RoHS
ABB Installation Products Heat Shrink Cable Boots & End Caps HTSHK BOOT HVYWL 3 LGS 300-1000KCMI Non-Stocked
Rp2.883.624,28
Rp2.841.245,02
Rp2.806.387,62
Min.: 10
Mult.: 10
ABB Installation Products Heat Shrink Cable Boots & End Caps HTSHK BOOT HVY WALL 4 LEGS 3/0-1000 Non-Stocked
Rp2.912.610,96
Rp2.869.681,32
Rp2.834.457,00
Min.: 10
Mult.: 10
ABB Installation Products Heat Shrink Cable Boots & End Caps HTSHK BOOT HVY WALL 3 LEGS 300-1000 Non-Stocked
Rp3.093.685,98
Rp2.974.070,06
Rp2.919.582,44
Rp2.890.412,30
Min.: 5
Mult.: 5
ABB Installation Products Heat Shrink Cable Boots & End Caps HTSHK BOOT HVY WALL 4 LEGS 4/0-1000 Non-Stocked
Rp9.669.259,30
Rp8.959.452,56
Rp8.638.030,64
Min.: 5
Mult.: 5
Square D Switch Fixings PSH BTTN PROTECTIVE BOOT 30MM, Type K Non-Stocked
Rp615.508,30
Min.: 1
Mult.: 1
Schneider Electric Switch Actuators PB OP.HEAD BLUE FLUSH METAL 22MM Non-Stocked
Rp521.760,24
Min.: 1
Mult.: 1
Schneider Electric Switch Actuators NON-ILLUM CLEAR BOOT YELLOW FLUSH Non-Stocked
Rp347.840,16
Min.: 1
Mult.: 1
Schneider Electric Switch Actuators NON-ILLUM CLEAR BOOT BLUE FLUSH Non-Stocked
Rp347.840,16
Min.: 1
Mult.: 1
TE Connectivity 151981-000
TE Connectivity Heat Shrink Cable Boots & End Caps 202C632-51-0-CS5325 Non-Stocked Lead-Time 8 Weeks
Rp669.262,08
Min.: 125
Mult.: 25
TE Connectivity 380041-000
TE Connectivity Heat Shrink Cable Boots & End Caps 202C632-50-0-CS5325 Non-Stocked Lead-Time 8 Weeks
Rp769.614,70
Rp766.495,88
Min.: 150
Mult.: 25
TE Connectivity 647271-000
TE Connectivity Heat Shrink Cable Boots & End Caps 202C642-51-0-CS5325 Non-Stocked Lead-Time 10 Weeks
Rp734.023,46
Rp724.483,54
Min.: 150
Mult.: 25
Apem U2175
Apem Switch Fixings Sealing Boot Non-Stocked Lead-Time 10 Weeks
Rp269.502,74
Rp232.627,28
Rp212.263,22
Rp187.129,20
Rp175.754,68
Min.: 1
Mult.: 1
TE Connectivity / Raychem 202C653-50-0-CS5325
TE Connectivity / Raychem Heat Shrink Cable Boots & End Caps 202C653-50-0-CS5325 Non-Stocked Lead-Time 8 Weeks
Rp1.600.505,04
Min.: 100
Mult.: 25
TE Connectivity / Raychem 202E334-50-0-CS5324
TE Connectivity / Raychem Heat Shrink Cable Boots & End Caps HS-BOOT Non-Stocked Lead-Time 8 Weeks
Rp916.199,24
Min.: 150
Mult.: 25
TE Connectivity / Raychem 202D153-12-60-0-CS5077
TE Connectivity / Raychem Heat Shrink Cable Boots & End Caps 202D153-12-60-0-CS5077 Non-Stocked Lead-Time 10 Weeks
Rp2.199.135,02
Rp1.958.618,96
Min.: 75
Mult.: 25
Electroswitch 6600-63-04
Electroswitch Switch Actuators Toggle Boot Silicon Rubber 15/32-32 UNS-2B 0.64 throat height above bushing, .625 Hex Dia, 15psi, -93 F to +400 F Non-Stocked Lead-Time 10 Weeks
Rp94.114,98
Rp83.841,22
Rp79.438,18
Rp76.502,82
Min.: 1
Mult.: 1
Grayhill 30M4070-2
Grayhill Switch Fixings BOOT,RBBR,PB SWITCH,CLR Non-Stocked Lead-Time 10 Weeks
Rp122.734,74
Rp113.561,74
Rp107.140,64
Rp101.820,30
Min.: 1
Mult.: 1
TE Connectivity / Raychem Heat Shrink Cable Boots & End Caps T-FIT ADAPTER/MOLDED PART KIT Non-Stocked Lead-Time 14 Weeks
Rp17.993.573,34
Min.: 39
Mult.: 1
No
TE Connectivity / Raychem Heat Shrink Cable Boots & End Caps 5420-12-340812 Non-Stocked Lead-Time 70 Weeks
Rp14.643.777,20
Min.: 10
Mult.: 5
No
IDEC EU9Z-DB1
IDEC Switch Bezels / Switch Caps Flush Rubber Boot Non-Stocked
Rp813.461,64
Rp782.089,98
Rp763.193,60
Rp735.307,68
Min.: 1
Mult.: 1
IDEC EU9Z-DB1N
IDEC Switch Bezels / Switch Caps Flush Rubber Boot - Nameplate Non-Stocked
Rp1.194.508,06
Rp1.092.320,84
Rp1.044.988,16
Rp1.010.864,60
Min.: 1
Mult.: 1
IDEC EU9Z-DB2
IDEC Switch Bezels / Switch Caps Ext Rubber Boot Non-Stocked
Rp887.396,02
Rp838.228,74
Rp804.655,56
Rp763.560,52
Min.: 1
Mult.: 1
IDEC EU9Z-DB2N
IDEC Switch Bezels / Switch Caps Ext Rubber Boot - Nameplate Non-Stocked
Rp1.194.508,06
Rp980.410,24
Rp980.226,78
Rp964.999,60
Min.: 1
Mult.: 1
TE Connectivity / Alcoswitch B1048204
TE Connectivity / Alcoswitch Switch Fixings BOOT SEAL RED 10-48 TT SERIES Non-Stocked Lead-Time 14 Weeks
Rp93.564,60
Min.: 1.000
Mult.: 1.000
TE Connectivity / AMP 208A011-3-0
TE Connectivity / AMP Heat Shrink Cable Boots & End Caps 208A011-3-0 Non-Stocked Lead-Time 36 Weeks
Rp463.236,50
Min.: 225
Mult.: 25