Electronic Components

Industrial Automation

Filters

Availability options

Applied filters

Select Image Part # Mfr. Description Datasheet Availability Pricing (IDR) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Samtec Computer Cables 0.80 mm Eye Speed I/O Rugged Latching High-Speed Cable Assembly Non-Stocked Lead-Time 4 Weeks
Rp3.352.914,96
Min.: 1
Mult.: 1
Samtec Computer Cables 0.80 mm Eye Speed I/O Rugged Latching High-Speed Cable Assembly Non-Stocked Lead-Time 4 Weeks
Rp3.898.708,46
Rp3.803.859,64
Rp3.802.942,34
Rp3.782.578,28
Min.: 1
Mult.: 1
Samtec Computer Cables 0.80 mm Eye Speed I/O Rugged Latching High-Speed Cable Assembly Non-Stocked Lead-Time 4 Weeks
Rp2.708.970,36
Rp2.707.686,14
Rp2.707.502,68
Rp2.707.135,76
Min.: 1
Mult.: 1
Samtec Computer Cables 0.80 mm Eye Speed I/O Rugged Latching High-Speed Cable Assembly Non-Stocked Lead-Time 4 Weeks
Rp2.801.434,20
Rp2.784.372,42
Rp2.784.188,96
Rp2.783.822,04
Min.: 1
Mult.: 1
Samtec Computer Cables 0.80 mm Eye Speed I/O Rugged Latching High-Speed Cable Assembly Non-Stocked Lead-Time 4 Weeks
Rp2.872.616,68
Min.: 1
Mult.: 1
Samtec Computer Cables 0.80 mm Eye Speed I/O Rugged Latching High-Speed Cable Assembly Non-Stocked Lead-Time 4 Weeks
Rp3.445.745,72
Rp3.411.622,16
Rp3.377.498,60
Rp3.343.191,58
Min.: 1
Mult.: 1
Samtec Computer Cables 0.80 mm Eye Speed I/O Rugged Latching High-Speed Cable Assembly Non-Stocked Lead-Time 4 Weeks
Rp3.403.366,46
Rp3.318.424,48
Rp3.314.021,44
Rp3.289.621,26
Min.: 1
Mult.: 1
Samtec Computer Cables 0.80 mm Eye Speed I/O Rugged Latching High-Speed Cable Assembly Non-Stocked Lead-Time 5 Weeks
Rp4.615.853,60
Min.: 1
Mult.: 1
Samtec Computer Cables 0.80 mm Eye Speed I/O Rugged Latching High-Speed Cable Assembly Lead-Time 4 Weeks
Rp5.450.229,68
Min.: 1
Mult.: 1
Samtec Computer Cables 0.80 mm Eye Speed I/O Rugged Latching High-Speed Cable Assembly Non-Stocked Lead-Time 5 Weeks
Rp2.333.244,28
Rp2.194.915,44
Rp2.062.273,86
Rp1.885.234,96
Min.: 1
Mult.: 1
Samtec Standard Card Edge Connectors 0.80 mm Eye Speed I/O Right-Angle Edge Rate Receptacle Non-Stocked Lead-Time 2 Weeks
Reel
Rp100.719,54
Rp92.463,84
Rp84.575,06
Rp79.438,18
Min.: 250
Mult.: 250
: 250
Samtec Standard Card Edge Connectors 0.80 mm Eye Speed I/O Right-Angle Edge Rate Receptacle Non-Stocked Lead-Time 1 Week
Rp158.876,36
Rp158.142,52
Rp146.584,54
Rp144.383,02
Min.: 1
Mult.: 1
Samtec Standard Card Edge Connectors 0.80 mm Eye Speed I/O Right-Angle Edge Rate Receptacle Non-Stocked Lead-Time 2 Weeks
Cut Tape
Rp203.273,68
Rp172.819,32
Rp172.635,86
Rp146.768,00
Reel
Rp117.964,78
Min.: 1
Mult.: 1
: 250
Samtec Ribbon Cables / IDC Cables 0.635 mm Eye Speed HD High-Speed High-Density I/O Cable Assembly Non-Stocked Lead-Time 8 Weeks
Rp1.198.360,72
Rp1.179.831,26
Rp1.133.048,96
Rp1.131.764,74
Min.: 1
Mult.: 1
Samtec Ribbon Cables / IDC Cables 0.635 mm Eye Speed HD High-Speed High-Density I/O Cable Assembly Non-Stocked Lead-Time 8 Weeks
Rp1.231.566,98
Rp1.211.936,76
Rp1.162.402,56
Rp1.159.467,20
Min.: 1
Mult.: 1
Samtec Ribbon Cables / IDC Cables 0.635 mm Eye Speed HD High-Speed High-Density I/O Cable Assembly Non-Stocked Lead-Time 8 Weeks
Rp1.233.951,96
Rp1.206.983,34
Rp1.167.355,98
Rp1.166.071,76
Min.: 1
Mult.: 1
Samtec Ribbon Cables / IDC Cables 0.635 mm Eye Speed HD High-Speed High-Density I/O Cable Assembly Non-Stocked Lead-Time 8 Weeks
Rp1.286.238,06
Rp1.266.424,38
Rp1.216.339,80
Rp1.214.872,12
Min.: 1
Mult.: 1
Samtec Ribbon Cables / IDC Cables 0.635 mm Eye Speed HD High-Speed High-Density I/O Cable Assembly Non-Stocked Lead-Time 8 Weeks
Rp1.341.642,98
Rp1.311.922,46
Rp1.267.892,06
Rp1.265.874,00
Min.: 1
Mult.: 1
Samtec Ribbon Cables / IDC Cables 0.635 mm Eye Speed HD High-Speed High-Density I/O Cable Assembly Non-Stocked Lead-Time 8 Weeks
Rp1.396.497,52
Rp1.374.482,32
Rp1.318.160,10
Rp1.314.857,82
Min.: 1
Mult.: 1
Samtec Ribbon Cables / IDC Cables 0.635 mm Eye Speed HD High-Speed High-Density I/O Cable Assembly Non-Stocked Lead-Time 8 Weeks
Rp1.401.817,86
Rp1.379.619,20
Rp1.323.296,98
Rp1.319.994,70
Min.: 1
Mult.: 1
Samtec Ribbon Cables / IDC Cables 0.635 mm Eye Speed HD High-Speed High-Density I/O Cable Assembly Non-Stocked Lead-Time 8 Weeks
Rp1.484.741,78
Rp1.424.016,52
Rp1.421.998,46
Rp1.402.735,16
Min.: 1
Mult.: 1
Samtec Ribbon Cables / IDC Cables 0.635 mm Eye Speed HD High-Speed High-Density I/O Cable Assembly Non-Stocked Lead-Time 8 Weeks
Rp1.501.803,56
Rp1.214.688,66
Min.: 1
Mult.: 1
Samtec Ribbon Cables / IDC Cables 0.635 mm Eye Speed HD High-Speed High-Density I/O Cable Assembly Non-Stocked Lead-Time 8 Weeks
Rp1.647.287,34
Rp1.579.957,52
Rp1.577.756,00
Rp1.556.291,18
Min.: 1
Mult.: 1
Samtec Ribbon Cables / IDC Cables 0.635 mm Eye Speed HD High-Speed High-Density I/O Cable Assembly Non-Stocked Lead-Time 8 Weeks
Rp1.701.591,50
Rp1.632.060,16
Rp1.629.858,64
Rp1.607.659,98
Min.: 1
Mult.: 1
Samtec Ribbon Cables / IDC Cables 0.635 mm Eye Speed HD High-Speed High-Density I/O Cable Assembly Non-Stocked Lead-Time 8 Weeks
Rp2.067.227,28
Rp1.997.879,40
Rp1.997.512,48
Rp1.972.745,38
Min.: 1
Mult.: 1