Filters

Availability options

Applied filters

Select Image Part # Mfr. Description Datasheet Availability Pricing (IDR) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Eaton Electrical Switch Contact Blocks / Switch Kits PILOT LIGHT KIT-RED RUN-120V Non-Stocked
Rp10.809.646,66
Min.: 1
Mult.: 1
Eaton Electrical Switch Contact Blocks / Switch Kits PILOT LIGHT KIT-RED RUN-480V Non-Stocked
Rp10.823.589,62
Min.: 1
Mult.: 1
Eaton Electrical LED Lenses & Assemblies RED PLASTIC LENS Non-Stocked
Rp1.360.906,28
Rp1.169.374,04
Rp1.064.985,30
Min.: 1
Mult.: 1
Bel Signal Transformer Common Mode Chokes / Filters CHOKE Lead-Time 16 Weeks
Rp2.822.899,02
Rp2.797.398,08
Rp2.675.947,56
Min.: 1
Mult.: 1
Bel Signal Transformer Power Transformers - Industrial TRANS ISOL HIGH EFF 2.0 KVA Non-Stocked Lead-Time 16 Weeks
Rp5.032.124,34
Min.: 5
Mult.: 5
Murata Power Solutions Power Supplies - Chassis Mount AC/DC 650W Openframe (4x6), 12V, Terminal Block, RoHs Non-Stocked Lead-Time 36 Weeks
Rp3.892.654,28
Min.: 120
Mult.: 20
Murata Power Solutions Power Supplies - Chassis Mount AC/DC 650W 6X4 U-CHANNEL 12VDC O/P Non-Stocked Lead-Time 36 Weeks
Rp3.892.654,28
Min.: 120
Mult.: 20
Murata Power Solutions Power Supplies - Chassis Mount AC/DC 650W Openframe (4x6), 24V, Terminal Block, RoHs Non-Stocked Lead-Time 36 Weeks
Rp4.303.237,76
Rp3.892.654,28
Min.: 1
Mult.: 1
Murata Power Solutions Power Supplies - Chassis Mount AC/DC 650W OPENFRAME(4X6), 28V Non-Stocked Lead-Time 36 Weeks
Rp3.892.654,28
Min.: 120
Mult.: 20
Murata Power Solutions Power Supplies - Chassis Mount AC/DC 650W Openframe (4x6), 48V, Terminal Block, RoHs (PoE) Non-Stocked Lead-Time 36 Weeks
Rp4.145.645,62
Min.: 120
Mult.: 20
Murata Power Solutions Power Supplies - Chassis Mount AC/DC 650W, 6 X4 U-CHANNEL, 28V O/P Non-Stocked Lead-Time 36 Weeks
Rp4.661.718,60
Rp4.351.671,20
Min.: 1
Mult.: 1
TE Connectivity Labels & Industrial Warning Signs HM 4/4" LABEL PRICE PER LABEL Non-Stocked Lead-Time 16 Weeks
Rp21.648,28
Min.: 3.900
Mult.: 1.300
TE Connectivity / AMP Labels & Industrial Warning Signs HW 4/4" LABEL PRICE PER LABEL Non-Stocked Lead-Time 16 Weeks
Rp25.684,40
Min.: 3.900
Mult.: 1.300
Phoenix Contact Pluggable Terminal Blocks 20 Pos 5.08mm pitch Plug 24-12 AWG Screw Non-Stocked Lead-Time 14 Weeks
Rp517.357,20
Min.: 50
Mult.: 50
Phoenix Contact Pluggable Terminal Blocks 20 Pos 5.08mm pitch Through Hole Header Non-Stocked Lead-Time 17 Weeks
Rp123.652,04
Min.: 1
Mult.: 1
Phoenix Contact Pluggable Terminal Blocks 20 Pos 5.08mm pitch Plug 24-12 AWG Screw Non-Stocked Lead-Time 14 Weeks
Rp955.092,76
Min.: 50
Mult.: 50
Phoenix Contact Pluggable Terminal Blocks MVSTBW 2 5/18-STF-5 Non-Stocked Lead-Time 15 Weeks
Rp381.229,88
Min.: 50
Mult.: 50
Phoenix Contact Pluggable Terminal Blocks 20 Pos 5.08mm pitch Plug 24-12 AWG Screw Non-Stocked Lead-Time 14 Weeks
Rp449.110,08
Min.: 50
Mult.: 50
Phoenix Contact Pluggable Terminal Blocks 18 Pos 5.08mm pitch Plug 24-12 AWG Screw Non-Stocked Lead-Time 18 Weeks
Rp449.660,46
Min.: 50
Mult.: 50
Bourns Planar Resistors - Chassis Mount SWA 2500A 100mV Non-Stocked
Rp8.468.330,14
Rp8.428.886,24
Rp8.211.853,06
Min.: 2
Mult.: 1
SolaHD Power Transformers - Industrial .100KVA 600-120/240 Non-Stocked
Rp2.684.570,18
Rp2.618.157,66
Rp2.577.796,46
Rp2.528.078,80
Min.: 1
Mult.: 1


SolaHD Power Transformers - Industrial 0.150KVA 600-120/240 Non-Stocked Lead-Time 13 Weeks
Rp4.944.797,38
Rp4.764.272,74
Rp4.752.714,76
Min.: 1
Mult.: 1
SolaHD Power Transformers - Industrial 0.250KVA 600-120/240 Non-Stocked Lead-Time 13 Weeks
Rp6.112.703,74
Rp5.984.098,28
Min.: 1
Mult.: 1
SolaHD Power Transformers - Industrial 0.250KVA 120X240-12/24 BB Non-Stocked Lead-Time 19 Weeks
Rp3.385.203,92
Rp3.085.246,82
Rp2.954.990,22
Rp2.874.451,28
Min.: 1
Mult.: 1
SolaHD Power Transformers - Industrial 0.100KVA 240X480-120/240 Non-Stocked Lead-Time 29 Weeks
Rp1.820.106,66
Rp1.680.677,06
Rp1.581.608,66
Min.: 1
Mult.: 1