|
|
DIN Rail Terminal Blocks TB Screw 4.0mm 2:2 1tier Blue
- XW5T-S4.0-2.2-1BL
- Omron Automation and Safety
-
1:
Rp143.098,80
-
Non-Stocked
|
Mouser Part No
653-XW5TS4.02.21BL
|
Omron Automation and Safety
|
DIN Rail Terminal Blocks TB Screw 4.0mm 2:2 1tier Blue
|
|
Non-Stocked
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
DIN Rail Terminal Blocks FuseTB w/FuseTerm 4.0mm 1:1 tier
- XW5T-S4.0-KD
- Omron Automation and Safety
-
1:
Rp144.566,48
-
Non-Stocked
|
Mouser Part No
653-XW5TS4.0KD
|
Omron Automation and Safety
|
DIN Rail Terminal Blocks FuseTB w/FuseTerm 4.0mm 1:1 tier
|
|
Non-Stocked
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
DIN Rail Terminal Blocks ACV indicator
- CDL4U(E)L D3/12
- Altech
-
1:
Rp120.166,30
-
Non-Stocked
|
Mouser Part No
845-CDL4UEID3/12
|
Altech
|
DIN Rail Terminal Blocks ACV indicator
|
|
Non-Stocked
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
DIN Rail Terminal Blocks Double Level Indicator Term.
- CDL4U(E)LD1
- Altech
-
1:
Rp99.802,24
-
Non-Stocked
|
Mouser Part No
845-CDL4UELD1
|
Altech
|
DIN Rail Terminal Blocks Double Level Indicator Term.
|
|
Non-Stocked
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
DIN Rail Terminal Blocks Double Level Indicator Term.
- CDL4U(E)LD2
- Altech
-
1:
Rp99.802,24
-
Non-Stocked
|
Mouser Part No
845-CDL4UELD2
|
Altech
|
DIN Rail Terminal Blocks Double Level Indicator Term.
|
|
Non-Stocked
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
DIN Rail Terminal Blocks DIN Term Blk Push-In 3 Conn
- CP4/3/DB
- Altech
-
1:
Rp102.921,06
-
Non-Stocked Lead-Time 13 Weeks
|
Mouser Part No
845-CP4/3/DB
|
Altech
|
DIN Rail Terminal Blocks DIN Term Blk Push-In 3 Conn
|
|
Non-Stocked Lead-Time 13 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
DIN Rail Terminal Blocks DIN Term Blk Push-In 4 Conn
- CP4/4/DB
- Altech
-
1:
Rp121.633,98
-
Non-Stocked Lead-Time 13 Weeks
|
Mouser Part No
845-CP4/4/DB
|
Altech
|
DIN Rail Terminal Blocks DIN Term Blk Push-In 4 Conn
|
|
Non-Stocked Lead-Time 13 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
DIN Rail Terminal Blocks DIN Term Blk Push-In 4 Conn
- CP4/4/O
- Altech
-
1:
Rp121.633,98
-
Non-Stocked Lead-Time 13 Weeks
|
Mouser Part No
845-CP4/4/O
|
Altech
|
DIN Rail Terminal Blocks DIN Term Blk Push-In 4 Conn
|
|
Non-Stocked Lead-Time 13 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
DIN Rail Terminal Blocks DIN Term Blk Push-In 4 Conn
- CP4/4/Y
- Altech
-
1:
Rp121.633,98
-
Non-Stocked Lead-Time 13 Weeks
|
Mouser Part No
845-CP4/4/Y
|
Altech
|
DIN Rail Terminal Blocks DIN Term Blk Push-In 4 Conn
|
|
Non-Stocked Lead-Time 13 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
DIN Rail Terminal Blocks DIN Term Blk Push-In, 8x4 Conn
- CP8L32/BL
- Altech
-
1:
Rp963.348,46
-
Non-Stocked Lead-Time 13 Weeks
|
Mouser Part No
845-CP8L32/BL
|
Altech
|
DIN Rail Terminal Blocks DIN Term Blk Push-In, 8x4 Conn
|
|
Non-Stocked Lead-Time 13 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
DIN Rail Terminal Blocks DIN Term Blk Push-In, 8x4 Conn
- CP8L32/BU
- Altech
-
1:
Rp963.348,46
-
Non-Stocked Lead-Time 13 Weeks
|
Mouser Part No
845-CP8L32/BU
|
Altech
|
DIN Rail Terminal Blocks DIN Term Blk Push-In, 8x4 Conn
|
|
Non-Stocked Lead-Time 13 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
DIN Rail Terminal Blocks DIN Term Blk Push-In, 8x4 Conn
- CP8L32/W
- Altech
-
1:
Rp963.348,46
-
Non-Stocked Lead-Time 13 Weeks
|
Mouser Part No
845-CP8L32/W
|
Altech
|
DIN Rail Terminal Blocks DIN Term Blk Push-In, 8x4 Conn
|
|
Non-Stocked Lead-Time 13 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
DIN Rail Terminal Blocks DIN Term Blk Push-In, 32 Conn
- CP8L32(I.S)/BL
- Altech
-
1:
Rp1.215.789,42
-
Non-Stocked Lead-Time 13 Weeks
|
Mouser Part No
845-CP8L32I.SBL
|
Altech
|
DIN Rail Terminal Blocks DIN Term Blk Push-In, 32 Conn
|
|
Non-Stocked Lead-Time 13 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
DIN Rail Terminal Blocks DIN Term Blk Push-In, 32 Conn
- CP8L32(I.S)/BU
- Altech
-
1:
Rp1.215.789,42
-
Non-Stocked Lead-Time 13 Weeks
|
Mouser Part No
845-CP8L32I.SBU
|
Altech
|
DIN Rail Terminal Blocks DIN Term Blk Push-In, 32 Conn
|
|
Non-Stocked Lead-Time 13 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
DIN Rail Terminal Blocks DIN Term Blk Push-In, 2x16 Conn
- CP8L32(I.S)H/BL
- Altech
-
1:
Rp1.336.506,10
-
Non-Stocked Lead-Time 13 Weeks
|
Mouser Part No
845-CP8L32I.SHBL
|
Altech
|
DIN Rail Terminal Blocks DIN Term Blk Push-In, 2x16 Conn
|
|
Non-Stocked Lead-Time 13 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
DIN Rail Terminal Blocks DIN Term Blk Push-In, 2x16 Conn
- CP8L32(I.S)H/BU
- Altech
-
1:
Rp1.336.506,10
-
Non-Stocked Lead-Time 13 Weeks
|
Mouser Part No
845-CP8L32I.SHBU
|
Altech
|
DIN Rail Terminal Blocks DIN Term Blk Push-In, 2x16 Conn
|
|
Non-Stocked Lead-Time 13 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
DIN Rail Terminal Blocks DIN Term Blk Push-In, 2x16 Conn
- CP8L32(I.S)H/W
- Altech
-
1:
Rp1.336.506,10
-
Non-Stocked Lead-Time 13 Weeks
|
Mouser Part No
845-CP8L32I.SHW
|
Altech
|
DIN Rail Terminal Blocks DIN Term Blk Push-In, 2x16 Conn
|
|
Non-Stocked Lead-Time 13 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
DIN Rail Terminal Blocks DIN Term Blk Push-In, 32 Conn
- CP8L32(I.S)/W
- Altech
-
1:
Rp1.215.789,42
-
Non-Stocked Lead-Time 13 Weeks
|
Mouser Part No
845-CP8L32I.SW
|
Altech
|
DIN Rail Terminal Blocks DIN Term Blk Push-In, 32 Conn
|
|
Non-Stocked Lead-Time 13 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
DIN Rail Terminal Blocks Feed-thru Termblock
- CSC4T1-2
- Altech
-
1:
Rp44.947,70
-
Non-Stocked
|
Mouser Part No
845-CSC4T1-2
|
Altech
|
DIN Rail Terminal Blocks Feed-thru Termblock
|
|
Non-Stocked
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
DIN Rail Terminal Blocks Feed-thru Termblock
- CSC4T2-2
- Altech
-
1:
Rp54.304,16
-
Non-Stocked
|
Mouser Part No
845-CSC4T2-2
|
Altech
|
DIN Rail Terminal Blocks Feed-thru Termblock
|
|
Non-Stocked
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
DIN Rail Terminal Blocks 3 Wire Snsr Trm Blck 6mm10A
- CTL2.5U-H(L)
- Altech
-
1:
Rp103.471,44
-
Non-Stocked
|
Mouser Part No
845-CTL2.5U-HL
|
Altech
|
DIN Rail Terminal Blocks 3 Wire Snsr Trm Blck 6mm10A
|
|
Non-Stocked
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
DIN Rail Terminal Blocks 3 Wire Snsr Trm Blck
- CTL2.5U-H(L)110
- Altech
-
1:
Rp220.518,92
-
Non-Stocked
|
Mouser Part No
845-CTL2.5U-HL110
|
Altech
|
DIN Rail Terminal Blocks 3 Wire Snsr Trm Blck
|
|
Non-Stocked
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Terminals TAB 20-14 AWG F TYPE Reel of 1000
- 170030-2 (Mouser Reel)
- TE Connectivity / AMP
-
1.000:
Rp4.806,65
-
Non-Stocked Lead-Time 27 Weeks
-
Factory Special Order
|
Mouser Part No
571-170030-2-MR
Factory Special Order
|
TE Connectivity / AMP
|
Terminals TAB 20-14 AWG F TYPE Reel of 1000
|
|
Non-Stocked Lead-Time 27 Weeks
|
|
Min.: 1.000
Mult.: 1.000
:
1.000
|
|
|
|
|
Wire Labels & Markers DEK 5/6 MC NE GE
Weidmuller 1238280000
- 1238280000
- Weidmuller
-
1.000:
Rp1.981,37
-
Non-Stocked
|
Mouser Part No
470-1238280000
|
Weidmuller
|
Wire Labels & Markers DEK 5/6 MC NE GE
|
|
Non-Stocked
|
|
Min.: 1.000
Mult.: 1.000
|
|
|
|
|
Wire Labels & Markers DEK 5/6 MC NE RT
Weidmuller 1238320000
- 1238320000
- Weidmuller
-
1.000:
Rp2.183,17
-
Non-Stocked
|
Mouser Part No
470-1238320000
|
Weidmuller
|
Wire Labels & Markers DEK 5/6 MC NE RT
|
|
Non-Stocked
|
|
Min.: 1.000
Mult.: 1.000
|
|
|