Advanced Energy Hardware

Results: 183
Select Image Part # Mfr. Description Datasheet Availability Pricing (IDR) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Advanced Energy / Impac 3 846 600
Advanced Energy / Impac Sensor Fixings & Accessories Support with CaF2 window (for IN 5/5) Non-Stocked Lead-Time 4 Weeks
Rp14.112.293,58
Rp11.908.021,68
Rp11.558.163,46
Min.: 1
Mult.: 1
Advanced Energy / Impac 3 846 610
Advanced Energy / Impac Sensor Fixings & Accessories Support with ZnSe window (for IN 5) Non-Stocked Lead-Time 4 Weeks
Rp15.712.615,16
Rp13.258.470,74
Rp12.868.801,70
Min.: 1
Mult.: 1
Advanced Energy / Impac 3 846 740
Advanced Energy / Impac Sensor Fixings & Accessories Vacuum Flange KF16 with Support for Series 300, with ZnSe - window Non-Stocked Lead-Time 4 Weeks
Rp19.703.237,08
Rp17.200.475,76
Min.: 1
Mult.: 1
Advanced Energy / Impac 3 852 280
Advanced Energy / Impac Sensor Fixings & Accessories Power supply 24 V DC, 500 mA, for C/Z-carrier rail mounting, Input 230 V AC Non-Stocked Lead-Time 4 Weeks
Rp4.873.798,36
Rp4.112.072,44
Rp3.821.471,80
Rp3.546.832,18
Min.: 1
Mult.: 1
Advanced Energy / Impac 3 882 058
Advanced Energy / Impac Sensor Fixings & Accessories Replacement optical fiber for IS 50-LO/GL, 10m Non-Stocked Lead-Time 4 Weeks
Rp19.429.514,76
Rp16.962.161,22
Min.: 1
Mult.: 1
Advanced Energy / Impac 3 882 059
Advanced Energy / Impac Sensor Fixings & Accessories Replacement optical fiber for IS 50-LO/GL, 15m Non-Stocked Lead-Time 4 Weeks
Rp26.818.366,26
Rp23.352.806,86
Min.: 1
Mult.: 1
Advanced Energy / Impac 3 907 130
Advanced Energy / Impac Sensor Fixings & Accessories Replacement optical fiber for IS 50-LO/GL, 1m Non-Stocked Lead-Time 4 Weeks
Rp12.657.272,32
Rp10.680.490,82
Rp10.366.223,84
Min.: 1
Mult.: 1
Advanced Energy / Impac 3 921 270
Advanced Energy / Impac Sensor Fixings & Accessories Electrical connection cable, 2m, 7-wire, analog out only Non-Stocked Lead-Time 4 Weeks
Rp2.198.401,18
Rp1.854.230,22
Rp1.723.423,24
Rp1.564.546,88
Min.: 1
Mult.: 1
Advanced Energy / Impac 5 837 230
Advanced Energy / Impac Sensor Fixings & Accessories Water cooling jacket (heavy duty) with air purge unit, unified thread (not for IN 6/78) Non-Stocked Lead-Time 4 Weeks
Rp28.446.206,84
Rp26.569.961,42
Min.: 1
Mult.: 1
Advanced Energy / Impac 5 837 370
Advanced Energy / Impac Sensor Fixings & Accessories Water cooling jacket (light duty) with air purge unit, unified thread Non-Stocked Lead-Time 4 Weeks
Rp20.387.359,42
Rp17.796.170,38
Min.: 1
Mult.: 1
Advanced Energy / Impac 5 837 410
Advanced Energy / Impac Sensor Fixings & Accessories Water cooling jacket for IN 6/78-L (Corning version) Non-Stocked Lead-Time 4 Weeks
Rp21.755.604,10
Rp18.944.996,90
Min.: 1
Mult.: 1
Advanced Energy / Trek TK-C4036R
Advanced Energy / Trek Sensor Fixings & Accessories Half Rack to Full Rack Mounting Kit (3 Buckeye) 320C, 323, 325, 347, 369, 370, 370TR, 601C-1, 603-1, 677B, 677B/1, PZD350(A)-1, PZD700(A)-1 Non-Stocked Lead-Time 11 Weeks
Rp11.854.451,36
Rp11.670.624,44
Min.: 1
Mult.: 1
Advanced Energy / Trek TK-C4060R
Advanced Energy / Trek Sensor Fixings & Accessories Dual Instrument Rack Mount Kit (3 Buckeye) 320C, 323, 325, 347, 369, 370, 370TR, 601C-1, 603-1, 677B, 677B/1, PZD350(A)-1, PZD700(A)-1 Non-Stocked Lead-Time 11 Weeks
Rp26.218.635,52
Min.: 1
Mult.: 1
Advanced Energy / Trek TK-C4102R
Advanced Energy / Trek Sensor Fixings & Accessories Rack Mount Kit (3 Buckeye/HALF SIZE UNIT) 217, 320C, 323, 325, 347, 369, 370, 370TR, 601C-1, 603-1, 677B, 677B/1, PZD350(A)-1, PZD700(A)-1, 2300 Non-Stocked Lead-Time 11 Weeks
Rp11.854.451,36
Rp11.670.624,44
Min.: 1
Mult.: 1
Advanced Energy / Trek TK-C4062R
Advanced Energy / Trek Sensor Fixings & Accessories Rack Mount Kit (5 Buckeye) 609B-3, 609E-6, 623B, 615, 615A-1, 615-3, 610E, P0865 Non-Stocked Lead-Time 11 Weeks
Rp11.854.451,36
Rp11.670.624,44
Min.: 1
Mult.: 1
Advanced Energy / Trek TK-C4051
Advanced Energy / Trek Sensor Fixings & Accessories Rack Mount Kit (7 Buckeye) 10/10A, 10/10B, 609E-6-FG, 615-10 Non-Stocked Lead-Time 11 Weeks
Rp11.854.451,36
Rp11.670.624,44
Min.: 1
Mult.: 1
Advanced Energy / Trek TK-C4085
Advanced Energy / Trek Sensor Fixings & Accessories Rack Mount Kit (8.75 Buckeye) - 10/10B-FG, 341B Non-Stocked Lead-Time 11 Weeks
Rp11.854.451,36
Rp11.670.624,44
Min.: 1
Mult.: 1
Advanced Energy / Trek TK-1K066R
Advanced Energy / Trek Sensor Fixings & Accessories Power Adaptor Kit for Model 646 Non-Stocked Lead-Time 11 Weeks
Rp6.548.604,70
Rp6.446.967,86
Min.: 1
Mult.: 1
Advanced Energy / Trek TK-13472R
Advanced Energy / Trek Sensor Fixings & Accessories + / -100V Electrostatic Sensor with RS-232 and USB ports, includes F5054R Adapter Non-Stocked Lead-Time 13 Weeks
Rp109.033.763,74
Min.: 1
Mult.: 1
Advanced Energy / Trek TK-17127-1
Advanced Energy / Trek Sensor Fixings & Accessories MODEL 6005B-1M EXTENSION CABLE Non-Stocked
Rp3.824.040,24
Rp3.764.599,20
Min.: 1
Mult.: 1
Advanced Energy / Trek TK-17127-2
Advanced Energy / Trek Sensor Fixings & Accessories MODEL 6005B-2M EXTENSION CABLE Non-Stocked
Rp4.254.253,94
Rp4.188.208,34
Min.: 1
Mult.: 1
Advanced Energy / Trek TK-17127-3
Advanced Energy / Trek Sensor Fixings & Accessories MODEL 6005B-3M EXTENSION CABLE Non-Stocked
Rp4.732.167,24
Rp4.658.783,24
Min.: 1
Mult.: 1
Advanced Energy / Trek TK-17127-4
Advanced Energy / Trek Sensor Fixings & Accessories MODEL 6005B-4M EXTENSION CABLE Non-Stocked
Rp5.162.380,94
Rp5.082.208,92
Min.: 1
Mult.: 1
Advanced Energy / Trek TK-17127-5
Advanced Energy / Trek Sensor Fixings & Accessories MODEL 6005B-5M EXTENSION CABLE Non-Stocked
Rp5.616.444,44
Rp5.529.300,94
Min.: 1
Mult.: 1
Advanced Energy / Trek TK-17127-6
Advanced Energy / Trek Sensor Fixings & Accessories MODEL 6005B-6M EXTENSION CABLE Non-Stocked
Rp6.070.691,40
Rp5.976.392,96
Min.: 1
Mult.: 1