Advanced Energy Hardware

Results: 183
Select Image Part # Mfr. Description Datasheet Availability Pricing (IDR) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Advanced Energy / Trek TK-1K065
Advanced Energy / Trek Sensor Fixings & Accessories Tripod for Charge Plate 2In Stock
Rp6.487.145,60
Rp5.473.345,64
Rp5.086.428,50
Rp4.806.468,54
Min.: 1
Mult.: 1
Advanced Energy / Trek Sensor Fixings & Accessories Charged-Plate Monitor without Plate* 1In Stock
Rp152.028.532,04
Min.: 1
Mult.: 1
Advanced Energy / Trek TK-17397R
Advanced Energy / Trek Sensor Fixings & Accessories Charge Plate with static dissipative Delrin (6 x 6) 2In Stock
Rp22.385.055,36
Rp19.573.530,86
Min.: 1
Mult.: 1
Advanced Energy / Artesyn 73-969-0001
Advanced Energy / Artesyn Racks & Rack Cabinet Accessories 19" 24KW SHORT Rack High Line 3-Phase Air Cooled 1In Stock
Rp92.207.179,46
Min.: 1
Mult.: 1
Advanced Energy / Artesyn 73-969-0001L
Advanced Energy / Artesyn Racks & Rack Cabinet Accessories 19" 24KW SHORT Rack Low Line 3-Phase Air Cooled 1In Stock
Rp92.207.179,46
Min.: 1
Mult.: 1
Advanced Energy / Trek Sensor Fixings & Accessories Surface and Volume Resistance Meter without Probe, includes F5054R Adapter Non-Stocked Lead-Time 10 Weeks
Rp48.014.417,36
Min.: 1
Mult.: 1
Advanced Energy / Trek Sensor Fixings & Accessories Model 152P-CR-1 Test Plates Non-Stocked Lead-Time 10 Weeks
Rp14.723.215,38
Rp12.460.419,74
Rp12.184.312,44
Min.: 1
Mult.: 1
Advanced Energy / Trek Sensor Fixings & Accessories Charge Plate with static dissipative Delrin (1 x 1) Non-Stocked Lead-Time 12 Weeks
Rp20.387.359,42
Rp19.525.464,34
Min.: 1
Mult.: 1
Advanced Energy / Trek Sensor Fixings & Accessories Charged-Plate Monitor without Plate* Non-Stocked Lead-Time 12 Weeks
Rp216.220.819,12
Min.: 1
Mult.: 1
Advanced Energy / Trek Sensor Fixings & Accessories Charged-Plate Monitor Kit* Non-Stocked Lead-Time 10 Weeks
Rp260.251.219,12
Min.: 1
Mult.: 1
Advanced Energy / Impac Sensor Fixings & Accessories Connecting plug, 3 pin, straight, for IS 50-LO/GL Non-Stocked Lead-Time 4 Weeks
Rp1.832.031,56
Rp1.545.283,58
Rp1.436.124,88
Rp1.314.307,44
Min.: 1
Mult.: 1
Advanced Energy / Impac Sensor Fixings & Accessories Air purge unit Series' 5 & 6 Non-Stocked Lead-Time 4 Weeks
Rp5.714.045,16
Rp4.821.145,34
Rp4.480.276,66
Rp4.232.238,74
Min.: 1
Mult.: 1
Advanced Energy / Impac Sensor Fixings & Accessories Air purge unit, stainless steel for Series 300 & 310, Optical head II or Series 218 Non-Stocked Lead-Time 4 Weeks
Rp5.882.277,98
Rp4.962.959,92
Rp4.612.184,40
Rp4.358.275,76
Min.: 1
Mult.: 1
Advanced Energy / Impac Sensor Fixings & Accessories Air purge unit with 90 mirror for Series 300 & 310, Optical Head II or Series 218 Non-Stocked Lead-Time 4 Weeks
Rp12.030.572,96
Rp10.149.741,04
Rp9.459.381,06
Min.: 1
Mult.: 1
Advanced Energy / Impac Sensor Fixings & Accessories Air purge and mounting angle for IS 5 / IS 50-LO/GL with ceramic tube 300mm Non-Stocked Lead-Time 4 Weeks
Rp24.081.693,44
Rp21.056.988,42
Min.: 1
Mult.: 1
Advanced Energy / Impac Sensor Fixings & Accessories Air purge unit, stainless steel for Series' 5 & 6 Non-Stocked Lead-Time 4 Weeks
Rp7.030.737,58
Rp5.931.628,72
Rp5.638.092,72
Min.: 1
Mult.: 1
Advanced Energy / Impac Sensor Fixings & Accessories 90 mirror for IS 5, IGA 5, ISR 6, IS 12, IGA 12 (series 12: only for fixed optics) Non-Stocked Lead-Time 4 Weeks
Rp22.166.187,58
Rp19.381.998,62
Min.: 1
Mult.: 1
Advanced Energy / Impac Sensor Fixings & Accessories Optical 90 adaptor with CaF2 window for IN 5/5 Non-Stocked Lead-Time 4 Weeks
Rp21.892.465,26
Rp19.142.766,78
Min.: 1
Mult.: 1
Advanced Energy / Impac Sensor Fixings & Accessories Optical 90 adaptor with ZnSe window for IN 5 Non-Stocked Lead-Time 4 Weeks
Rp26.915.600,06
Rp25.140.441,10
Min.: 1
Mult.: 1
Advanced Energy / Impac Sensor Fixings & Accessories Ceramic tube for IS 50-LO/GL, d=35*27mm, open, 600mm Non-Stocked Lead-Time 4 Weeks
Rp18.737.320,18
Rp16.622.209,84
Rp16.253.455,24
Min.: 1
Mult.: 1
Advanced Energy / Impac Sensor Fixings & Accessories Ceramic tube for IS 50-LO/GL, d=35*27mm, closed, 600mm Non-Stocked Lead-Time 4 Weeks
Rp14.839.712,48
Rp12.558.937,76
Rp12.280.262,02
Min.: 1
Mult.: 1
Advanced Energy / Impac Sensor Fixings & Accessories Cooling jacket Series 300 with integrated air purge unit Non-Stocked Lead-Time 4 Weeks
Rp13.093.723,66
Rp11.310.675,92
Rp11.056.033,44
Min.: 1
Mult.: 1
Advanced Energy / Impac Sensor Fixings & Accessories Water cooling jacket (heavy duty) with air purge unit (not for IN 6/78) Non-Stocked Lead-Time 4 Weeks
Rp28.446.206,84
Rp26.569.961,42
Min.: 1
Mult.: 1
Advanced Energy / Impac Sensor Fixings & Accessories Cooling jacket with integrated air purge and ZnSe window Series 300 Non-Stocked Lead-Time 4 Weeks
Rp21.208.342,92
Rp18.717.873,42
Rp18.470.018,96
Min.: 1
Mult.: 1
Advanced Energy / Impac Sensor Fixings & Accessories Water cooling jacket (heavy duty) with fused silica window (not for IN 6/78) Non-Stocked Lead-Time 4 Weeks
Rp28.956.592,56
Rp27.046.590,50
Min.: 1
Mult.: 1