SO/SOS Through-Hole Self-Clinching Standoffs

PEM SO/SOS Through-Hole Self-Clinching Standoffs utilize a proven self-clinching design, providing an ideal solution for applications where the mounting and spacing of boards or panels are required. Pressed into round holes, these fasteners from PEM mount permanently into sheets as thin as 0.63mm. SO standoffs are for use in steel or aluminum sheets of HRB 80/HB 150 or less, while the SOS standoffs are recommended for steel or aluminum sheets HRB 70/HB 120 or less. PEM SO/SOS Through-Hole Self-Clinching Standoffs feature hardened stainless steel construction.

Results: 539
Select Image Part # Mfr. Description Datasheet Availability Pricing (IDR) Filter the results in the table by unit price based on your quantity. Qty. RoHS ECAD Model Product Type Thread Size Length Material Outside Diameter Plating Gender
PEM Standoffs & Spacers STANDOFF, STEEL Non-Stocked Lead-Time 10 Weeks
Rp11.907
Min.: 10.000
Mult.: 5.000
Standoffs Round 10-32 0.875 in
PEM Standoffs & Spacers STANDOFF, STEEL Non-Stocked Lead-Time 13 Weeks
Rp8.091
Min.: 10.000
Mult.: 5.000
Standoffs Round 10-32 0.437 in
PEM Standoffs & Spacers STANDOFF, STEEL Non-Stocked Lead-Time 13 Weeks
Rp9.907
Min.: 10.000
Mult.: 5.000
Standoffs Round 10-32 0.562 in
PEM Standoffs & Spacers STANDOFF, STEEL Non-Stocked Lead-Time 13 Weeks
Rp10.292
Min.: 10.000
Mult.: 5.000
Standoffs Round 10-32 0.625 in
PEM Standoffs & Spacers STANDOFF, STEEL Non-Stocked Lead-Time 13 Weeks
Rp10.714
Min.: 10.000
Mult.: 5.000
Standoffs Round 10-32 0.687 in
PEM Standoffs & Spacers STANDOFF, STEEL Non-Stocked Lead-Time 13 Weeks
Rp11.044
Min.: 10.000
Mult.: 5.000
Standoffs Round 10-32 0.75 in
PEM Standoffs & Spacers STANDOFF, STEEL Non-Stocked Lead-Time 13 Weeks
Rp11.778
Min.: 10.000
Mult.: 5.000
Standoffs Round 10-32 0.812 in
PEM Standoffs & Spacers Non-Stocked Lead-Time 13 Weeks
Rp13.668
Min.: 10.000
Mult.: 5.000
Standoffs Round 10-32 0.937 in
PEM Standoffs & Spacers STANDOFF, STEEL Non-Stocked Lead-Time 13 Weeks
Rp15.190
Min.: 10.000
Mult.: 5.000
Standoffs Round 10-32 1 in
PEM Standoffs & Spacers STANDOFF, STEEL Non-Stocked Lead-Time 13 Weeks
Rp16.566
Min.: 10.000
Mult.: 5.000
Standoffs Round 10-32 1.062 in
PEM Standoffs & Spacers STANDOFF, STEEL Non-Stocked Lead-Time 22 Weeks
Rp7.155
Min.: 10.000
Mult.: 5.000
Standoffs Round 14 mm
PEM Standoffs & Spacers STANDOFF, STEEL Non-Stocked Lead-Time 13 Weeks
Rp9.558
Min.: 10.000
Mult.: 5.000
Standoffs Round 18 mm
PEM Standoffs & Spacers STANDOFF, STEEL Non-Stocked Lead-Time 13 Weeks
Rp5.596
Min.: 10.000
Mult.: 5.000
Standoffs Round 0.312 in 0.116 in
PEM Standoffs & Spacers Non-Stocked Lead-Time 13 Weeks
Rp5.962
Min.: 10.000
Mult.: 5.000
Standoffs Round 0.375 in 0.116 in
PEM Standoffs & Spacers STANDOFF, STEEL Non-Stocked Lead-Time 13 Weeks
Rp11.044
Min.: 10.000
Mult.: 5.000
Standoffs Round 0.562 in 0.116 in
PEM Standoffs & Spacers STANDOFF, STEEL Non-Stocked Lead-Time 13 Weeks
Rp11.723
Min.: 10.000
Mult.: 5.000
Standoffs Round 0.625 in 0.116 in
PEM Standoffs & Spacers STANDOFF, STEEL Non-Stocked Lead-Time 13 Weeks
Rp15.044
Min.: 10.000
Mult.: 5.000
Standoffs Round 0.687 in 0.116 in
PEM Standoffs & Spacers Non-Stocked Lead-Time 13 Weeks
Rp15.943
Min.: 10.000
Mult.: 5.000
Standoffs Round 0.75 in 0.116 in
PEM Standoffs & Spacers STANDOFF, STEEL Non-Stocked Lead-Time 13 Weeks
Rp5.045
Min.: 10.000
Mult.: 5.000
Standoffs Round 0.125 in 0.116 in
PEM Standoffs & Spacers STANDOFF, STEEL Non-Stocked Lead-Time 13 Weeks
Rp5.339
Min.: 10.000
Mult.: 5.000
Standoffs Round 0.25 in 0.116 in
PEM Standoffs & Spacers Non-Stocked Lead-Time 13 Weeks
Rp6.439
Min.: 10.000
Mult.: 5.000
Standoffs Round 0.312 in
PEM Standoffs & Spacers STANDOFF, STEEL Non-Stocked Lead-Time 13 Weeks
Rp6.806
Min.: 10.000
Mult.: 5.000
Standoffs Round 0.375 in
PEM Standoffs & Spacers STANDOFF, STEEL Non-Stocked Lead-Time 13 Weeks
Rp9.118
Min.: 10.000
Mult.: 5.000
Standoffs Round 0.437 in
PEM Standoffs & Spacers STANDOFF, STEEL Non-Stocked Lead-Time 13 Weeks
Rp9.632
Min.: 10.000
Mult.: 5.000
Standoffs Round 0.5 in
PEM Standoffs & Spacers STANDOFF, STEEL Non-Stocked Lead-Time 13 Weeks
Rp9.687
Min.: 10.000
Mult.: 5.000
Standoffs Round 0.562 in