- 35 C Embedded Solutions

Results: 346
Select Image Part # Mfr. Description Datasheet Availability Pricing (IDR) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Quectel Mobile Modules Non-Stocked Lead-Time 10 Weeks
Reel
Rp368.020,76
Rp361.232,74
Min.: 250
Mult.: 250
: 250
Quectel Multiprotocol Modules GSM/GPRS/GNSS, Quad-band, Supports BT3.0 only, Ultra-small, LCC form factor Non-Stocked Lead-Time 12 Weeks
Reel
Rp234.278,42
Rp230.242,30
Min.: 250
Mult.: 250
: 250
Quectel Multiprotocol Modules SC200E with eMCP memory. Recommended to use discrete memory option for better pricing(EAU >2000pcs) Non-Stocked Lead-Time 18 Weeks
Cut Tape
Rp5.007.724,16
Min.: 600
Mult.: 200
: 200
Quectel Multiprotocol Modules SC200E with eMCP memory. Recommended to use discrete memory option for better pricing(EAU >2000pcs) Non-Stocked Lead-Time 18 Weeks
Cut Tape
Rp5.519.761,02
Min.: 600
Mult.: 200
: 200
Quectel Multiprotocol Modules SC200E with eMCP memory(EAU >2000pcs) Non-Stocked Lead-Time 18 Weeks
Cut Tape
Rp4.679.881,14
Min.: 600
Mult.: 200
: 200
Quectel Mobile Modules WCDMA Non-Stocked
Cut Tape
Rp478.647,14
Min.: 300
Mult.: 100
: 100
Quectel Mobile Modules WCDMA Non-Stocked
Reel
Rp391.136,72
Min.: 250
Mult.: 250
: 250
Quectel Mobile Modules WCDMA Non-Stocked
Cut Tape
Rp508.000,74
Min.: 300
Mult.: 100
: 100
Quectel Multiprotocol Modules Longevity till 2030, Linux version (EAU >2000pcs) Non-Stocked Lead-Time 20 Weeks
Cut Tape
Rp3.448.130,70
Min.: 600
Mult.: 200
: 200
Quectel Multiprotocol Modules cloud enabled, Cat 1 + 3G + 2G, MQTT, 1Gbit ROM+1Gbit RAM, Global Non-Stocked Lead-Time 24 Weeks
Reel
Rp1.481.072,58
Min.: 250
Mult.: 250
: 250
Quectel Multiprotocol Modules (EAU >2000pcs) Non-Stocked Lead-Time 18 Weeks
Cut Tape
Rp8.264.689,54
Min.: 560
Mult.: 80
: 80
Quectel Multiprotocol Modules Smart Modules Non-Stocked
Reel
Rp2.479.461,90
Min.: 250
Mult.: 250
: 250
Quectel Multiprotocol Modules Longevity till 2025. Recommended to push SC682A for new designs (EAU >2000pcs) Non-Stocked Lead-Time 20 Weeks
Cut Tape
Rp5.120.001,68
Min.: 600
Mult.: 200
: 200
Quectel Multiprotocol Modules Longevity till 2025. Recommended to push SC682A for new designs (EAU >2000pcs) Non-Stocked Lead-Time 20 Weeks
Cut Tape
Rp4.852.333,54
Min.: 600
Mult.: 200
: 200
Quectel Multiprotocol Modules Longevity extended till 2028. Recommended to push SC682A for new designs (EAU >2000pcs) Non-Stocked Lead-Time 18 Weeks
Cut Tape
Rp4.544.854,58
Min.: 600
Mult.: 200
: 200
Quectel Multiprotocol Modules Longevity extended till 2028. Recommended to push SC682A for new designs (EAU >2000pcs) Non-Stocked Lead-Time 20 Weeks
Cut Tape
Rp4.650.894,46
Min.: 600
Mult.: 200
: 200
Quectel Multiprotocol Modules Longevity extended till 2028. Recommended to push SC682A for new designs (EAU >2000pcs) Non-Stocked Lead-Time 20 Weeks
Cut Tape
Rp4.163.257,78
Min.: 600
Mult.: 200
: 200
Quectel Multiprotocol Modules Cat M1/ NB2 / NB-IoT NTN Module (Global coverage over GEO constellation) Non-Stocked Lead-Time 18 Weeks
Reel
Rp409.299,26
Min.: 500
Mult.: 500
: 500
Quectel Multiprotocol Modules cloud enabled, Cat M1/Cat NB2, Power Class 5 (21dBm) + GNSS (w/o WWAN concurrency) Non-Stocked Lead-Time 20 Weeks
Reel
Rp487.820,14
Min.: 250
Mult.: 250
: 250
Quectel Multiprotocol Modules cloud enabled, Cat M1/Cat NB2/EGPRS, Power Class 5 (21dBm) + GNSS (w/o WWAN concurrency), Data ONLY! Non-Stocked Lead-Time 20 Weeks
Reel
Rp516.806,82
Min.: 250
Mult.: 250
: 250
Quectel Mobile Modules NB only, Low-cost, compatible w/ BC95/BG95 series (Unisoc based) Non-Stocked Lead-Time 14 Weeks
Reel
Rp130.806,98
Rp124.936,26
Rp120.900,14
Min.: 250
Mult.: 250
: 250
Quectel Multiprotocol Modules Cat M1/Cat NB2/EGPRS + GNSS (w/o WWAN concurrency), VoLTE Non-Stocked Lead-Time 20 Weeks
Cut Tape
Rp705.954,08
Rp617.342,90
Rp586.705,08
Rp544.692,74
Reel
Rp510.018,80
Min.: 1
Mult.: 1
: 250
Quectel Multiprotocol Modules Cat M1/Cat NB2 - QuecOpen + GNSS (w/o WWAN concurrency) Non-Stocked Lead-Time 22 Weeks
Reel
Rp370.772,66
Min.: 500
Mult.: 500
: 500
Quectel Mobile Modules Cat M1/Cat NB2, Super Compact Size, Power Class 5 + GNSS (w/o WWAN concurrency), supports VoLTE Non-Stocked Lead-Time 20 Weeks
Reel
Rp506.166,14
Min.: 500
Mult.: 500
: 500
Quectel Multiprotocol Modules Cat M1/Cat NB2/EGPRS, Power Class 5 (21dBm) + GNSS (w/o WWAN concurrency) Non-Stocked Lead-Time 20 Weeks
Reel
Rp511.303,02
Min.: 250
Mult.: 250
: 250