EP Series Engineering Tools

Results: 11
Select Image Part # Mfr. Description Datasheet Availability Pricing (IDR) Filter the results in the table by unit price based on your quantity. Qty. RoHS Product Type Product
NKK Switches Switch Development Tools Logic Board with 2 Stndrd Compact Sckts 2In Stock
Rp873.637
Rp771.266
Rp729.987
Rp714.393
Min.: 1
Mult.: 1
Switch Development Tools
NKK Switches IS-ENG-KIT-6-HH
NKK Switches Switch Development Tools SYSTEM, FOR LCD 64x32 RGB, 2 HYBRID SWITCH, CN2469 48Factory Stock Available
Rp4.081.618
Min.: 1
Mult.: 1
Switch Development Tools
NKK Switches Switch Development Tools PS for Dev Kit s 120V 9V 0.5A Non-Stocked Lead-Time 4 Weeks
Rp320.505
Rp302.526
Rp296.655
Rp293.536
Min.: 1
Mult.: 1
Switch Development Tools
NKK Switches Switch Development Tools 2 Switch Controller with Enlosure Non-Stocked
Rp2.144.464
Rp1.957.151
Min.: 1
Mult.: 1
Switch Development Tools
NKK Switches Switch Development Tools SWITCH ACCESSORY Non-Stocked Lead-Time 26 Weeks
Rp3.056.077
Rp2.996.819
Min.: 1
Mult.: 1
Switch Development Tools
NKK Switches Switch Development Tools Logic Board with 2 Standard RGB Sockets Non-Stocked Lead-Time 18 Weeks
Rp1.617.383
Rp1.557.942
Min.: 1
Mult.: 1
Switch Development Tools
NKK Switches Switch Development Tools SWITCH ACCESSORY Non-Stocked Lead-Time 26 Weeks
Rp2.486.066
Rp2.402.959
Min.: 1
Mult.: 1
Switch Development Tools
NKK Switches Switch Development Tools Logic Board w/ 2 Hi Res Stnd Sw Sockets Non-Stocked Lead-Time 18 Weeks
Rp939.132
Rp831.257
Rp811.811
Rp731.272
Min.: 1
Mult.: 1
Switch Development Tools
NKK Switches Switch Development Tools Logic Board w/ 2 Hi Res Compact Sockets Non-Stocked
Rp659.355
Rp568.909
Rp553.132
Rp550.197
Min.: 1
Mult.: 1
Switch Development Tools
NKK Switches Switch Development Tools Logic Board with 2 OLED Switch Sockets Non-Stocked Lead-Time 18 Weeks
Rp839.146
Rp800.986
Rp784.658
Rp739.711
Rp733.106
Min.: 1
Mult.: 1
Switch Development Tools
NKK Switches IS-S0109DEM-1
NKK Switches Display Development Tools DEMO KIT, FOR S0109, LCD 36x24 RGB, RIBBON HEADER, CN2851 Non-Stocked Lead-Time 26 Weeks
Rp3.132.580
Min.: 1
Mult.: 1
Display Development Tools Evaluation Kits