|
|
Power Supplies - Rack Mount 3kW Rectifier Module
- DCIPS2-3000X
- Transtector
-
1:
Rp33.527.315,00
-
Non-Stocked Lead-Time 16 Weeks
-
New Product
|
Mouser Part No
21-DCIPS2-3000X
New Product
|
Transtector
|
Power Supplies - Rack Mount 3kW Rectifier Module
|
|
Non-Stocked Lead-Time 16 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Power Supplies - Rack Mount 4kW Solar Module
- DCIPS2-SOLAR
- Transtector
-
1:
Rp33.527.315,00
-
Non-Stocked Lead-Time 16 Weeks
-
New Product
|
Mouser Part No
21-DCIPS2-SOLAR
New Product
|
Transtector
|
Power Supplies - Rack Mount 4kW Solar Module
|
|
Non-Stocked Lead-Time 16 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Power Supplies - Rack Mount DC Integrated Power System, 2RU, Single Feed, 63A/2x25A/2x16A Load Breakers, 2x 100A Battery Breakers, Load Controller
- DCIPS2B-S-00-B11
- Transtector
-
1:
Rp107.794.124,52
-
Non-Stocked Lead-Time 28 Weeks
-
New At Mouser
|
Mouser Part No
21-DCIPS2B-S-00-B11
New At Mouser
|
Transtector
|
Power Supplies - Rack Mount DC Integrated Power System, 2RU, Single Feed, 63A/2x25A/2x16A Load Breakers, 2x 100A Battery Breakers, Load Controller
|
|
Non-Stocked Lead-Time 28 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Power Supplies - Rack Mount 2U DC Power System
- DCIPS2B-S-00-B63
- Transtector
-
1:
Rp107.599.290,00
-
Non-Stocked Lead-Time 16 Weeks
-
New Product
|
Mouser Part No
21-DCIPS2B-S-00-B63
New Product
|
Transtector
|
Power Supplies - Rack Mount 2U DC Power System
|
|
Non-Stocked Lead-Time 16 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Power Supplies - Chassis Mount 1500W Outdoor Power Supply
- DCOPS-1500
- Transtector
-
1:
Rp30.571.590,94
-
Non-Stocked Lead-Time 16 Weeks
-
New Product
|
Mouser Part No
21-DCOPS-1500
New Product
|
Transtector
|
Power Supplies - Chassis Mount 1500W Outdoor Power Supply
|
|
Non-Stocked Lead-Time 16 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Power Supplies - Chassis Mount 3000W Outdoor Power Supply
- DCOPS-3000
- Transtector
-
1:
Rp56.028.867,46
-
Non-Stocked Lead-Time 16 Weeks
-
New Product
|
Mouser Part No
21-DCOPS-3000
New Product
|
Transtector
|
Power Supplies - Chassis Mount 3000W Outdoor Power Supply
|
|
Non-Stocked Lead-Time 16 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Power Outlet Strips Rack mount DC PDU Rack Mount PDU DC 1RU -24 to -48 Vdc Dual-Feed 2x 300A Feeds 8x Per Feed
- DCPDU1B-D-2X8-150
- Transtector
-
1:
Rp24.950.560,00
-
Non-Stocked Lead-Time 28 Weeks
-
New At Mouser
|
Mouser Part No
21-DCPDU1B-D-2X8-150
New At Mouser
|
Transtector
|
Power Outlet Strips Rack mount DC PDU Rack Mount PDU DC 1RU -24 to -48 Vdc Dual-Feed 2x 300A Feeds 8x Per Feed
|
|
Non-Stocked Lead-Time 28 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Power Outlet Strips DC PDU, 2U, SINGLE-FEED, 48/24VDC, 450A, 20 BRKR POSITIONS
- DCPDU2B-S-X20-450
- Transtector
-
1:
Rp46.002.595,00
-
Non-Stocked Lead-Time 28 Weeks
-
New At Mouser
|
Mouser Part No
21-DCPDU2B-S-X20-450
New At Mouser
|
Transtector
|
Power Outlet Strips DC PDU, 2U, SINGLE-FEED, 48/24VDC, 450A, 20 BRKR POSITIONS
|
|
Non-Stocked Lead-Time 28 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Power Outlet Strips DC PDU, 2U, DUAL-FEED, 48/24VDC, 450A/FEED, 10 BRKR POSITIONS EA BUS
- DCPDU2B-D-2X10-450
- Transtector
-
1:
Rp55.945.943,54
-
Non-Stocked Lead-Time 28 Weeks
-
New At Mouser
|
Mouser Part No
21-DCPDU2BD2X10450
New At Mouser
|
Transtector
|
Power Outlet Strips DC PDU, 2U, DUAL-FEED, 48/24VDC, 450A/FEED, 10 BRKR POSITIONS EA BUS
|
|
Non-Stocked Lead-Time 28 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
EV Charging Cables EV Charging Cable, J1772, 32A, 18 foot
- EVCC-1772L232-18
- Transtector
-
1:
Rp4.829.951,42
-
Non-Stocked Lead-Time 20 Weeks
-
New At Mouser
|
Mouser Part No
21-EVCC-1772L232-18
New At Mouser
|
Transtector
|
EV Charging Cables EV Charging Cable, J1772, 32A, 18 foot
|
|
Non-Stocked Lead-Time 20 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
EV Charging Cables EV Charging Cable, J1772, 40A, 18 foot
- EVCC-1772L240-18
- Transtector
-
1:
Rp5.320.523,46
-
Non-Stocked Lead-Time 20 Weeks
-
New At Mouser
|
Mouser Part No
21-EVCC-1772L240-18
New At Mouser
|
Transtector
|
EV Charging Cables EV Charging Cable, J1772, 40A, 18 foot
|
|
Non-Stocked Lead-Time 20 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
EV Charging Cables EV Charging Cable, J1772, 48A, 18 foot
- EVCC-1772L248-18
- Transtector
-
1:
Rp5.660.107,92
-
Non-Stocked Lead-Time 20 Weeks
-
New At Mouser
|
Mouser Part No
21-EVCC-1772L248-18
New At Mouser
|
Transtector
|
EV Charging Cables EV Charging Cable, J1772, 48A, 18 foot
|
|
Non-Stocked Lead-Time 20 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Power over Ethernet - PoE - Industrial PoE Injector, Metal Industrial Outdoor IP67, Gigabit, 802.3at+ 802.3af, 1-Port, 30W, 54V, End-span
- POEOD1GAT-TT
- Transtector
-
1:
Rp3.721.302,64
-
Non-Stocked Lead-Time 23 Weeks
-
New At Mouser
|
Mouser Part No
21-POEOD1GAT-TT
New At Mouser
|
Transtector
|
Power over Ethernet - PoE - Industrial PoE Injector, Metal Industrial Outdoor IP67, Gigabit, 802.3at+ 802.3af, 1-Port, 30W, 54V, End-span
|
|
Non-Stocked Lead-Time 23 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Power over Ethernet - PoE - Industrial PoE Injector, Metal Industrial IP67 Outdoor, Gigabit, 802.3bt 802.3at+, 1-Port, 60W, 55V, Type 3 PSE, End-span or Mid-span
- POEOD1GBT-TT
- Transtector
-
1:
Rp5.042.581,56
-
Non-Stocked Lead-Time 23 Weeks
-
New At Mouser
|
Mouser Part No
21-POEOD1GBT-TT
New At Mouser
|
Transtector
|
Power over Ethernet - PoE - Industrial PoE Injector, Metal Industrial IP67 Outdoor, Gigabit, 802.3bt 802.3at+, 1-Port, 60W, 55V, Type 3 PSE, End-span or Mid-span
|
|
Non-Stocked Lead-Time 23 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Power over Ethernet - PoE - Industrial PoE Splitter, Metal Industrial IP67 Outdoor, Gigabit, 802.3bt 802.3at+, 1-Port, 60W, 12V, Type 3 PD, End-span or Mid-span
- POESOD1GBT-TT
- Transtector
-
1:
Rp3.843.853,92
-
Non-Stocked Lead-Time 23 Weeks
-
New At Mouser
|
Mouser Part No
21-POESOD1GBT-TT
New At Mouser
|
Transtector
|
Power over Ethernet - PoE - Industrial PoE Splitter, Metal Industrial IP67 Outdoor, Gigabit, 802.3bt 802.3at+, 1-Port, 60W, 12V, Type 3 PD, End-span or Mid-span
|
|
Non-Stocked Lead-Time 23 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
AC Power Leads Heavy-Duty CPU/PDU Power Cord, IEC C14 to IEC C13, 15 A, 1 foot, Black
- TTA00002-01F
- Transtector
-
1:
Rp348.390,54
-
Non-Stocked Lead-Time 20 Weeks
-
New At Mouser
|
Mouser Part No
21-TTA00002-01F
New At Mouser
|
Transtector
|
AC Power Leads Heavy-Duty CPU/PDU Power Cord, IEC C14 to IEC C13, 15 A, 1 foot, Black
|
|
Non-Stocked Lead-Time 20 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
AC Power Leads Heavy-Duty CPU/PDU Power Cord, IEC C14 to IEC C13, 15 A, 2 feet, Black
- TTA00002-02F
- Transtector
-
1:
Rp413.885,76
-
Non-Stocked Lead-Time 20 Weeks
-
New At Mouser
|
Mouser Part No
21-TTA00002-02F
New At Mouser
|
Transtector
|
AC Power Leads Heavy-Duty CPU/PDU Power Cord, IEC C14 to IEC C13, 15 A, 2 feet, Black
|
|
Non-Stocked Lead-Time 20 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
AC Power Leads Heavy-Duty CPU/PDU Power Cord, IEC C14 to IEC C13, 15 A, 3 feet, Black
- TTA00002-03F
- Transtector
-
1:
Rp522.494,08
-
Non-Stocked Lead-Time 20 Weeks
-
New At Mouser
|
Mouser Part No
21-TTA00002-03F
New At Mouser
|
Transtector
|
AC Power Leads Heavy-Duty CPU/PDU Power Cord, IEC C14 to IEC C13, 15 A, 3 feet, Black
|
|
Non-Stocked Lead-Time 20 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
AC Power Leads Heavy-Duty CPU/PDU Power Cord, IEC C14 to IEC C13, 15 A, 6 feet, Black
- TTA00002-06F
- Transtector
-
1:
Rp694.396,10
-
Non-Stocked Lead-Time 20 Weeks
-
New At Mouser
|
Mouser Part No
21-TTA00002-06F
New At Mouser
|
Transtector
|
AC Power Leads Heavy-Duty CPU/PDU Power Cord, IEC C14 to IEC C13, 15 A, 6 feet, Black
|
|
Non-Stocked Lead-Time 20 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
AC Power Leads Heavy-Duty CPU/PDU Power Cord, IEC C14 to IEC C13, 15 A, 8 feet, Black
- TTA00002-08F
- Transtector
-
1:
Rp836.944,52
-
Non-Stocked Lead-Time 20 Weeks
-
New At Mouser
|
Mouser Part No
21-TTA00002-08F
New At Mouser
|
Transtector
|
AC Power Leads Heavy-Duty CPU/PDU Power Cord, IEC C14 to IEC C13, 15 A, 8 feet, Black
|
|
Non-Stocked Lead-Time 20 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
AC Power Leads Heavy-Duty CPU/PDU Power Cord, IEC C14 to IEC C13, 15 A, 12 feet, Black
- TTA00002-12F
- Transtector
-
1:
Rp980.593,70
-
Non-Stocked Lead-Time 20 Weeks
-
New At Mouser
|
Mouser Part No
21-TTA00002-12F
New At Mouser
|
Transtector
|
AC Power Leads Heavy-Duty CPU/PDU Power Cord, IEC C14 to IEC C13, 15 A, 12 feet, Black
|
|
Non-Stocked Lead-Time 20 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
AC Power Leads Heavy-Duty CPU/PDU Power Cord, IEC C14 to IEC C13, 15 A, 25 feet, Black
- TTA00002-25F
- Transtector
-
1:
Rp1.801.210,28
-
Non-Stocked Lead-Time 20 Weeks
-
New At Mouser
|
Mouser Part No
21-TTA00002-25F
New At Mouser
|
Transtector
|
AC Power Leads Heavy-Duty CPU/PDU Power Cord, IEC C14 to IEC C13, 15 A, 25 feet, Black
|
|
Non-Stocked Lead-Time 20 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
AC Power Leads Heavy-Duty CPU/PDU Power Cord, IEC C14 to IEC C13, 15 A, 1 foot, Blue
- TTA00002BL-01F
- Transtector
-
1:
Rp328.209,94
-
Non-Stocked Lead-Time 20 Weeks
-
New At Mouser
|
Mouser Part No
21-TTA00002BL-01F
New At Mouser
|
Transtector
|
AC Power Leads Heavy-Duty CPU/PDU Power Cord, IEC C14 to IEC C13, 15 A, 1 foot, Blue
|
|
Non-Stocked Lead-Time 20 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
AC Power Leads Heavy-Duty CPU/PDU Power Cord, IEC C14 to IEC C13, 15 A, 2 feet, Blue
- TTA00002BL-02F
- Transtector
-
1:
Rp437.735,56
-
Non-Stocked Lead-Time 20 Weeks
-
New At Mouser
|
Mouser Part No
21-TTA00002BL-02F
New At Mouser
|
Transtector
|
AC Power Leads Heavy-Duty CPU/PDU Power Cord, IEC C14 to IEC C13, 15 A, 2 feet, Blue
|
|
Non-Stocked Lead-Time 20 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
AC Power Leads Heavy-Duty CPU/PDU Power Cord, IEC C14 to IEC C13, 15 A, 3 feet, Blue
- TTA00002BL-03F
- Transtector
-
1:
Rp536.070,12
-
Non-Stocked Lead-Time 20 Weeks
-
New At Mouser
|
Mouser Part No
21-TTA00002BL-03F
New At Mouser
|
Transtector
|
AC Power Leads Heavy-Duty CPU/PDU Power Cord, IEC C14 to IEC C13, 15 A, 3 feet, Blue
|
|
Non-Stocked Lead-Time 20 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|