Bulk Optoelectronic Development Tools

Results: 767
Select Image Part # Mfr. Description Datasheet Availability Pricing (IDR) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Texas Instruments LED Lighting Development Tools LP8868Y-Q1 evaluatio n module Non-Stocked Lead-Time 12 Weeks
Rp6.269.562,04
Min.: 1
Mult.: 1
Max.: 5
Texas Instruments LED Lighting Development Tools LP8868Z-Q1 evaluatio n module Non-Stocked Lead-Time 12 Weeks
Rp6.269.562,04
Min.: 1
Mult.: 1
Max.: 5
Texas Instruments LED Lighting Development Tools TPS923612 evaluation module Non-Stocked Lead-Time 12 Weeks
Rp1.078.744,80
Min.: 1
Mult.: 1
Max.: 5
Texas Instruments LED Lighting Development Tools Evaluation Module Non-Stocked Lead-Time 12 Weeks
Rp1.234.135,42
Min.: 1
Mult.: 1
Max.: 5
Broadcom / Avago Optical Sensor Development Tools slit adapter set version 2 Non-Stocked Lead-Time 12 Weeks
Rp13.327.451,70
Min.: 5
Mult.: 1
Broadcom / Avago Fibre Optic Development Tools FG,LPE36002-AP,GEN7,64GFC,PCIE,2P Non-Stocked Lead-Time 12 Weeks
Rp74.164.255,38
Min.: 5
Mult.: 5
Wurth Elektronik LED Lighting Development Tools Horticulture - LEDs Development Kit Non-Stocked Lead-Time 12 Weeks
Rp10.576.102,08
Min.: 1
Mult.: 1
Wurth Elektronik LED Lighting Development Tools LED Design Kit Non-Stocked Lead-Time 7 Weeks
Rp4.097.395,64
Min.: 1
Mult.: 1
Seeed Studio Optical Sensor Development Tools Grove - 80cm Infrared Proximity Sensor Non-Stocked Lead-Time 7 Weeks
Rp265.833,54
Min.: 1
Mult.: 1
Future Designs, Inc. (FDI) Display Development Tools Renesas Synergy 7.0" PCAP Touch LCD GUI - Dev Kit Non-Stocked Lead-Time 1 Week
Rp9.815.110,00
Min.: 5
Mult.: 5
Future Designs, Inc. (FDI) Display Development Tools Renesas Synergy 7.0" Res Touch LCD GUI - Dev Kit Non-Stocked Lead-Time 1 Week
Rp9.815.110,00
Min.: 5
Mult.: 5
Future Designs, Inc. (FDI) Display Development Tools 4.3" Res Touch LCD GUI Dev Kit Non-Stocked Lead-Time 1 Week
Rp7.698.898,90
Rp7.698.715,44
Min.: 5
Mult.: 5
Future Designs, Inc. (FDI) Display Development Tools uEZGUI 4.3 Enclosure w/ uEZGUI-EXP1 Non-Stocked Lead-Time 1 Week
Rp6.421.100,00
Rp6.329.370,00
Min.: 5
Mult.: 5
Future Designs, Inc. (FDI) Display Development Tools 5.0" PCAP Touch LCD GUI Dev Kit Non-Stocked Lead-Time 1 Week
Rp7.246.670,00
Min.: 5
Mult.: 5
Future Designs, Inc. (FDI) Display Development Tools 7.0" Res Touch LCD GUI - Dev Kit Non-Stocked Lead-Time 1 Week
Rp9.815.110,00
Min.: 1
Mult.: 1
Future Designs, Inc. (FDI) Display Development Tools 4.3" PCAP Touch LCD GUI Dev Kit Non-Stocked Lead-Time 1 Week
Rp7.246.670,00
Min.: 1
Mult.: 1

KEMET Optical Sensor Development Tools Sensor Control Board Evaluation Kit Non-Stocked Lead-Time 11 Weeks
Rp7.911.712,50
Min.: 1
Mult.: 1
onsemi Optical Sensor Development Tools C-SERIES 1MM 35U SMTPA Non-Stocked Lead-Time 3 Weeks
Rp2.183.724,38
Min.: 1
Mult.: 1

onsemi LED Lighting Development Tools OCTAL LED SEQUENCING EVB Non-Stocked Lead-Time 6 Weeks
Rp5.474.629,86
Min.: 1
Mult.: 1
onsemi LED Lighting Development Tools AUTO ASSP Non-Stocked Lead-Time 6 Weeks
Rp4.029.148,52
Min.: 1
Mult.: 1
onsemi LED Lighting Development Tools OCTAL REAR COMB LIGHT EVB Non-Stocked Lead-Time 6 Weeks
Rp4.670.524,68
Min.: 1
Mult.: 1
onsemi LED Lighting Development Tools SINGLE CHANNEL DRL EVB Non-Stocked Lead-Time 6 Weeks
Rp4.029.148,52
Min.: 1
Mult.: 1
Texas Instruments LED Lighting Development Tools LM3492EVAL BOARD Non-Stocked Lead-Time 12 Weeks
Rp1.236.153,48
Min.: 1
Mult.: 1
Max.: 5
ams OSRAM LED Lighting Development Tools Demo Board for AS1181 Lead-Time 12 Weeks
Rp4.355.890,78
Min.: 1
Mult.: 1


ams OSRAM Optical Sensor Development Tools Ambient Light Sensor Optical Module EVM Non-Stocked Lead-Time 2 Weeks
Rp4.411.846,08
Min.: 1
Mult.: 1