Panduit Test & Measurement

Results: 94
Select Image Part # Mfr. Description Datasheet Availability Pricing (IDR) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Panduit VS-AVT-DL
Panduit Test Accessories - Other Verisafe AVT Diagnostic Codes Label, Pack of 5
8Expected 22/09/2026
Rp427.645
Rp418.472
Rp406.364
Rp397.558
Min.: 1
Mult.: 1
Panduit WT27544B01
Panduit Test Accessories - Other pat1mxb.SWITCH,MEMBRANE (With Stainless Steel Subplate)*PAT1M4.0 Fmy
1On Order
Rp2.923.985
Rp2.718.877
Rp2.713.557
Min.: 1
Mult.: 1
Panduit Component Testers VeriSafe Absence of Voltage Tester- 2 Ft.(0.6m) Cable, 3 Ft. (0.9m) Leads, For Europe Non-Stocked Lead-Time 12 Weeks
Rp9.312.797
Min.: 1
Mult.: 1
Panduit Test Accessories - Other Verisafe Replacement AVT System Cable, 4 ft. Non-Stocked Lead-Time 4 Weeks
Rp1.210.286
Rp1.183.867
Rp1.150.111
Rp1.121.491
Min.: 1
Mult.: 1
Panduit Test Accessories - Other VeriSafe 2.0 AVT Three-Phase Isolation Module Replacement Non-Stocked Lead-Time 4 Weeks
Rp11.382.592
Rp11.133.270
Min.: 1
Mult.: 1
Panduit Component Testers VeriSafe 2.0 Absence of Voltage Tester. Includes Three-Phase Battery-powered Indicator Module, 2ft (0.6m) System Cable, and 10ft (3.0m) Sensor Leads
Panduit Component Testers VeriSafe 2.0 Absence of Voltage Tester. Includes Three-Phase Battery-Free Indicator Module, 16ft (4.8m) System Cable, and 10ft (3.0m) Sensor Leads Non-Stocked Lead-Time 7 Weeks
Rp18.313.895
Min.: 1
Mult.: 1
Panduit Calibration, Warranties, & Service Plans UPS Installation Service Per unit Install (Business Hours) 1-5 kVA UPS and EBP, Trip Charge Included Non-Stocked Lead-Time 10 Weeks
Rp13.005.296
Min.: 1
Mult.: 1
Panduit Calibration, Warranties, & Service Plans UPS Installation Service Per unit Install (Business Hours) 1-5 kVA UPS and EBP, Additional hours for units are at the same location, same visit Non-Stocked Lead-Time 10 Weeks
Rp5.954.745
Min.: 1
Mult.: 1
Panduit Calibration, Warranties, & Service Plans UPS Installation Service per unit 1-5 kVA and EBP Per Install (Nonbusiness Hours) - OT Labor included, Trip Charge Included Non-Stocked Lead-Time 10 Weeks
Rp23.037.806
Min.: 1
Mult.: 1
Panduit Calibration, Warranties, & Service Plans UPS Installation Service Per unit Install (Nonbusiness Hours) 1-5 kVA UPS and EBP, Additional hours for units are at the same location, same visit Non-Stocked Lead-Time 10 Weeks
Rp6.649.141
Min.: 1
Mult.: 1
Panduit Calibration, Warranties, & Service Plans UPS Installation Service Per unit Install (Business Hours) 6-10 kVA UPS and EBP, Trip Charge Included Non-Stocked Lead-Time 10 Weeks
Rp19.101.672
Min.: 1
Mult.: 1
Panduit Calibration, Warranties, & Service Plans UPS Installation Service Per unit Install (Business Hours) 6-10 kVA UPS and EBP, Additional hours for units are at the same location, same visit Non-Stocked Lead-Time 10 Weeks
Rp11.731.900
Min.: 1
Mult.: 1
Panduit Calibration, Warranties, & Service Plans UPS Installation Service per unit 6-10 kVA and EBP Per Install (Nonbusiness Hours) - OT Labor included, Trip Charge Included Non-Stocked Lead-Time 10 Weeks
Rp35.331.461
Min.: 1
Mult.: 1
Panduit Calibration, Warranties, & Service Plans UPS Installation Service Per unit Install (Nonbusiness Hours) 6-10 kVA UPS and EBP, Additional hours for units are at the same location, same visit Non-Stocked Lead-Time 10 Weeks
Rp13.005.296
Min.: 1
Mult.: 1
Panduit Calibration, Warranties, & Service Plans Standard On-Site service, (48 hour SLA) (2 hour standard) Normal Business Hours Non-Stocked Lead-Time 10 Weeks
Rp27.526.889
Min.: 1
Mult.: 1
Panduit Calibration, Warranties, & Service Plans Standard On-Site service, (48 hour SLA) (2 hour standard) Outside Normal Business Hours plus Sunday and Holiday Non-Stocked Lead-Time 10 Weeks
Rp36.449.466
Min.: 1
Mult.: 1
Panduit Calibration, Warranties, & Service Plans Annual Preventative Maintenance On-Site UPS and Battery Inspection (2 hour standard) Non-Stocked Lead-Time 10 Weeks
Rp111.480.203
Min.: 1
Mult.: 1
Panduit Calibration, Warranties, & Service Plans Semi-Annual Preventative Maintenance On-Site UPS and Battery Inspection (2 hour standard) Non-Stocked Lead-Time 10 Weeks
Rp198.376.582
Min.: 1
Mult.: 1
Panduit Calibration, Warranties, & Service Plans UPS Site Audit/Survey (Up to 1.5 Hours) Including Trip Charge Non-Stocked Lead-Time 10 Weeks
Rp24.634.092
Min.: 1
Mult.: 1
Panduit Calibration, Warranties, & Service Plans UPS Site Audit/Survey Additional hours for units are at the same location, same visit Non-Stocked Lead-Time 10 Weeks
Rp10.076.724
Min.: 1
Mult.: 1
Panduit AC Power Leads Power Cord, 3-pin, 10A, 2m, IEC320-C13 to GB2099 (Americas) Non-Stocked
Rp326.559
Rp303.993
Rp294.637
Rp287.298
Min.: 1
Mult.: 1
Panduit AC Power Leads Power Cord, 3-pin, 10A, 2m, IEC320-C13 to BS1363A (UK) Non-Stocked
Rp535.703
Rp502.864
Rp487.453
Rp476.262
Min.: 1
Mult.: 1
Panduit AC Power Leads Power Cord, 3-pin, 10A, 2m, IEC320-C13 to GB2099 (China) Non-Stocked
Rp382.881
Rp359.031
Rp347.840
Rp339.218
Min.: 1
Mult.: 1
Panduit Test Accessories - Other VeriSafe Replacement AVT System Cable, 2 ft. Non-Stocked
Rp1.122.775
Rp1.031.412
Rp1.006.095
Rp981.328
Min.: 1
Mult.: 1