Everything Goes Data

Phoenix Contact provides optimized components with shielding that meet specifications for reliable data transmission in various applications. Today's digital world relies on electrification, networking, and automation, requiring the manufacturing of smart networked devices with many more end-to-end interfaces. The growing demand for the performance of connection technology in field applications means intelligent devices are becoming increasingly networked, increasing the total number of interfaces. Data connectivity forms the basis for high data rates and stable connections, while consistent quality in data transmissions depends on the interaction of all cables and connector components. Phoenix Contact offers suitable connections on the device and in the field for the designer's applications.

Results: 756
Select Image Part # Mfr. Description Datasheet Availability Pricing (IDR) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Phoenix Contact Fibre Optic Cable Assemblies FOC-17S4-LCD2-GF01/2 Non-Stocked Lead-Time 25 Weeks
Rp5.585.256,24
Min.: 1
Mult.: 1
Phoenix Contact Fibre Optic Cable Assemblies FOC-17S4-LCD2-GF01/1 Non-Stocked Lead-Time 25 Weeks
Rp5.347.492,08
Min.: 1
Mult.: 1
Phoenix Contact Fibre Optic Cable Assemblies FOC-17P24-17P24-GL03/200 Non-Stocked Lead-Time 25 Weeks
Rp76.052.058,78
Min.: 1
Mult.: 1
Phoenix Contact Fibre Optic Cable Assemblies FOC-17P24-17P24-GL03/190 Non-Stocked Lead-Time 25 Weeks
Rp73.318.871,70
Min.: 1
Mult.: 1
Phoenix Contact Fibre Optic Cable Assemblies FOC-17S4-LCD2-GF01/0 6 Non-Stocked Lead-Time 25 Weeks
Rp5.488.939,74
Min.: 1
Mult.: 1
Phoenix Contact Fibre Optic Cable Assemblies FOC-17P24-17P24-GL03/180 Non-Stocked Lead-Time 25 Weeks
Rp70.586.235,00
Min.: 1
Mult.: 1
Phoenix Contact Fibre Optic Cable Assemblies FOC-FR19:1U-217S4-LCD4-OM1 Non-Stocked Lead-Time 26 Weeks
Rp18.109.886,98
Min.: 1
Mult.: 1
Phoenix Contact Fibre Optic Cable Assemblies FOC-17P24-17P24-GL03/170 Non-Stocked Lead-Time 25 Weeks
Rp67.852.864,46
Min.: 1
Mult.: 1
Phoenix Contact Fibre Optic Cable Assemblies FOC-17P24-17P24-GL03/140 Non-Stocked Lead-Time 25 Weeks
Rp59.653.303,22
Min.: 1
Mult.: 1
Phoenix Contact Fibre Optic Cable Assemblies FOC-17P24-17P24-GL03/100 Non-Stocked Lead-Time 25 Weeks
Rp48.721.472,20
Min.: 1
Mult.: 1
Phoenix Contact Fibre Optic Cable Assemblies FOC-17P24-17P24-GL03/90 Non-Stocked Lead-Time 25 Weeks
Rp45.987.918,20
Min.: 1
Mult.: 1
Phoenix Contact Fibre Optic Cable Assemblies FOC-17P24-17P24-GL03/110 Non-Stocked Lead-Time 25 Weeks
Rp53.769.374,10
Min.: 1
Mult.: 1
Phoenix Contact Fibre Optic Cable Assemblies FOC-17P24-17P24-GL03/120 Non-Stocked Lead-Time 25 Weeks
Rp54.187.295,98
Min.: 1
Mult.: 1
Phoenix Contact Fibre Optic Cable Assemblies FOC-17P24-17P24-GL03/130 Non-Stocked Lead-Time 25 Weeks
Rp56.920.116,14
Min.: 1
Mult.: 1
Phoenix Contact Fibre Optic Cable Assemblies FOC-17P24-17P24-GL03/150 Non-Stocked Lead-Time 25 Weeks
Rp62.387.040,68
Min.: 1
Mult.: 1
Phoenix Contact Fibre Optic Cable Assemblies FOC-17P24-17P24-GL03/160 Non-Stocked Lead-Time 25 Weeks
Rp65.119.677,38
Min.: 1
Mult.: 1
Phoenix Contact Fibre Optic Cable Assemblies FOC-17P4-17P4-GL01/200 Non-Stocked Lead-Time 25 Weeks
Rp33.035.458,74
Min.: 1
Mult.: 1
Phoenix Contact Fibre Optic Cable Assemblies FOC-17P4-17P4-GL01/190 Non-Stocked Lead-Time 25 Weeks
Rp31.846.454,48
Min.: 1
Mult.: 1
Phoenix Contact Fibre Optic Cable Assemblies FOC-17P4-17P4-GL01/180 Non-Stocked Lead-Time 25 Weeks
Rp30.658.917,90
Min.: 1
Mult.: 1
Phoenix Contact Fibre Optic Cable Assemblies FOC-17P4-17P4-GL01/170 Non-Stocked Lead-Time 25 Weeks
Rp29.470.280,56
Min.: 1
Mult.: 1
Phoenix Contact Fibre Optic Cable Assemblies FOC-17P4-17P4-GL01/160 Non-Stocked Lead-Time 25 Weeks
Rp28.281.826,68
Min.: 1
Mult.: 1
Phoenix Contact Fibre Optic Cable Assemblies FOC-17P4-17P4-GL01/140 Non-Stocked Lead-Time 25 Weeks
Rp25.905.652,76
Min.: 1
Mult.: 1
Phoenix Contact Fibre Optic Cable Assemblies FOC-17P4-17P4-GL01/130 Non-Stocked Lead-Time 25 Weeks
Rp24.717.198,88
Min.: 1
Mult.: 1
Phoenix Contact Fibre Optic Cable Assemblies FOC-17P4-17P4-GL01/120 Non-Stocked Lead-Time 25 Weeks
Rp23.528.561,54
Min.: 1
Mult.: 1
Phoenix Contact Fibre Optic Cable Assemblies FOC-17P24-17P24-GL03/60 Non-Stocked Lead-Time 25 Weeks
Rp37.788.356,96
Min.: 1
Mult.: 1