- 25 C Wire & Cable

Types of Wire & Cable

Change category view
Results: 298
Select Image Part # Mfr. Description Datasheet Availability Pricing (IDR) Filter the results in the table by unit price based on your quantity. Qty. RoHS


Molex Sensor Junction Blocks Mini-Change (7/8''), 5 Poles, 4 Ports, Pass-Through, DeviceNet 6Factory Stock Available
Rp7.387.934,20
Rp6.523.654,14
Rp6.440.179,84
Min.: 1
Mult.: 1
Molex Sensor Junction Blocks Mini-Change 4 Pole, 8 Ports Drop DeviceNet Aux Pwr 37Factory Stock Available
Rp6.703.261,48
Rp6.539.798,62
Min.: 1
Mult.: 1
Phoenix Contact Sensor Junction Blocks SACB-4/T-L8FUSE DIAG CT AXL 4Factory Stock Available
Rp8.005.827,48
Min.: 1
Mult.: 1
Phoenix Contact Sensor Junction Blocks SACB-8/16-L-PTP P12 201Factory Stock Available
Rp3.004.891,34
Min.: 1
Mult.: 1

TE Connectivity / Schaffner AC Power Leads 10A C13 plug 500cm wire ends 67Factory Stock Available
Rp438.836,32
Rp415.903,82
Rp383.798,32
Rp372.056,88
Min.: 50
Mult.: 50

Phoenix Contact Sensor Junction Blocks SACB-8/16- 5 0PUR P12 SH 4Factory Stock Available
Rp8.525.569,66
Min.: 1
Mult.: 1

Schurter AC Power Leads AU CORDSET 10A 5.0m V-LOCK
60Expected 04/02/2027
Rp431.497,92
Rp366.736,54
Rp341.602,52
Rp337.199,48
Rp321.055,00
Min.: 1
Mult.: 1
Phoenix Contact Sensor Junction Blocks AXL E ETHDI8DO8M126P 8Factory Stock Available
Rp9.008.986,76
Min.: 1
Mult.: 1
Phoenix Contact Sensor Junction Blocks AXL E ETH DIO16M126P 59Factory Stock Available
Rp10.741.766,46
Min.: 1
Mult.: 1
WAGO Sensor Junction Blocks M12 sensor/actuator box; 4-way; 4-pole; M23 connector Non-Stocked Lead-Time 4 Weeks
Rp2.234.909,72
Rp1.936.603,76
Rp1.845.424,14
Rp1.788.735,00
Min.: 1
Mult.: 1
WAGO Sensor Junction Blocks M12 sensor/actuator box; 4-way; 5-pole; M23 connector Non-Stocked Lead-Time 4 Weeks
Rp3.603.154,40
Rp2.745.478,90
Rp2.542.388,68
Rp2.426.441,96
Min.: 1
Mult.: 1
WAGO Sensor Junction Blocks M12 sensor/actuator box; 6-way; 4-pole; M23 connector Non-Stocked Lead-Time 4 Weeks
Rp3.431.619,30
Rp2.614.671,92
Rp2.421.305,08
Rp2.310.862,16
Min.: 1
Mult.: 1
WAGO Sensor Junction Blocks M12 sensor/actuator box; 6-way; 5-pole; M23 connector Non-Stocked Lead-Time 4 Weeks
Rp4.321.950,68
Rp3.332.550,90
Rp3.101.574,76
Rp2.969.667,02
Min.: 1
Mult.: 1
WAGO Sensor Junction Blocks M12 sensor/actuator box; 8-way; 4-pole; M23 connector Non-Stocked Lead-Time 4 Weeks
Rp3.838.717,04
Rp2.959.943,64
Rp2.754.651,90
Rp2.637.604,42
Min.: 1
Mult.: 1
WAGO Sensor Junction Blocks M12 sensor/actuator box; 8-way; 5-pole; M23 connector Non-Stocked Lead-Time 4 Weeks
Rp4.743.174,84
Rp3.657.275,10
Rp3.403.733,38
Rp3.258.983,44
Min.: 1
Mult.: 1
WAGO Sensor Junction Blocks M12 sensor/actuator box; 8-way; 5-pole; M23 connector; Without LED Non-Stocked Lead-Time 4 Weeks
Rp3.976.678,96
Rp3.066.350,44
Rp2.853.720,30
Rp2.732.453,24
Min.: 1
Mult.: 1
WAGO Sensor Junction Blocks M12 sensor/actuator box Non-Stocked Lead-Time 4 Weeks
Rp3.567.379,70
Rp2.718.143,36
Rp2.517.254,66
Rp2.402.408,70
Min.: 1
Mult.: 1
WAGO Sensor Junction Blocks M12 sensor/actuator box; 4-way; 4-pole; 10 m Non-Stocked Lead-Time 4 Weeks
Rp4.321.950,68
Rp3.332.550,90
Rp3.101.574,76
Rp2.969.667,02
Min.: 1
Mult.: 1
WAGO Sensor Junction Blocks M12 sensor/actuator box Non-Stocked Lead-Time 4 Weeks
Rp4.052.631,40
Rp3.124.874,18
Rp2.908.207,92
Rp2.784.555,88
Min.: 1
Mult.: 1
WAGO Sensor Junction Blocks M12 sensor/actuator box; 6-way; 4-pole; 5 m Non-Stocked Lead-Time 4 Weeks
Rp4.090.607,62
Rp3.154.227,78
Rp2.935.543,46
Rp2.810.790,66
Min.: 1
Mult.: 1
WAGO Sensor Junction Blocks M12 sensor/actuator box; 6-way; 5-pole; 5 m Non-Stocked Lead-Time 4 Weeks
Rp5.219.620,46
Rp4.053.548,70
Rp3.783.312,12
Rp3.629.205,72
Min.: 1
Mult.: 1
WAGO Sensor Junction Blocks M12 sensor/actuator box Non-Stocked Lead-Time 4 Weeks
Rp7.089.444,78
Rp5.510.588,02
Rp5.143.851,48
Min.: 1
Mult.: 1
WAGO Sensor Junction Blocks M12 sensor/actuator box; 8-way; 4-pole; 5 m Non-Stocked Lead-Time 4 Weeks
Rp4.594.572,24
Rp3.542.796,06
Rp3.297.143,12
Rp3.156.979,68
Min.: 1
Mult.: 1
WAGO Sensor Junction Blocks M12 sensor/actuator box; 8-way; 4-pole; 10 m Non-Stocked Lead-Time 4 Weeks
Rp5.523.980,60
Rp4.290.028,64
Rp4.004.014,50
Rp3.840.735,10
Min.: 1
Mult.: 1
WAGO Sensor Junction Blocks M12 sensor/actuator box; 8-way; 4-pole; 25 m Non-Stocked Lead-Time 4 Weeks
Rp9.182.356,46
Rp7.298.589,18
Rp6.869.843,16
Min.: 1
Mult.: 1