|
|
Sensor Junction Blocks M12 Sig, A-Coded, MPIS Passive Distribution Box, Side Mount, 3 Poles, 6 Ports, NPN LED Indicators, PVC Home Run Cable w/ 8 Poles Mini-Change (7/8'') Conn., 0.30m (0.984') Lg.
- 1201150041
- Molex
-
1:
Rp5.634.423,52
-
Non-Stocked Lead-Time 17 Weeks
|
Mouser Part No
538-1201150041
|
Molex
|
Sensor Junction Blocks M12 Sig, A-Coded, MPIS Passive Distribution Box, Side Mount, 3 Poles, 6 Ports, NPN LED Indicators, PVC Home Run Cable w/ 8 Poles Mini-Change (7/8'') Conn., 0.30m (0.984') Lg.
|
|
Non-Stocked Lead-Time 17 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Sensor Junction Blocks M12 Sig, A-Coded, MPIS Ultra-Lock Passive Distribution Box, Stainless Steel, Top-Mount, 8 Ports, PNP LED Indicators, 10.0m (32.8') Lg.
- 1201190043
- Molex
-
5:
Rp19.659.023,22
-
Non-Stocked Lead-Time 14 Weeks
|
Mouser Part No
538-1201190043
|
Molex
|
Sensor Junction Blocks M12 Sig, A-Coded, MPIS Ultra-Lock Passive Distribution Box, Stainless Steel, Top-Mount, 8 Ports, PNP LED Indicators, 10.0m (32.8') Lg.
|
|
Non-Stocked Lead-Time 14 Weeks
|
|
Min.: 5
Mult.: 5
|
|
|
|
|
Sensor Junction Blocks M12 Sig, A-Coded, MPIS Ultra-Lock Passive Distribution Box, Stainless Steel, Top-Mount, 8 Port Ultra-Lock, PNP LED Indicators, 15.0m (49.2') Lg.
- 1201190046
- Molex
-
50:
Rp24.067.933,94
-
Non-Stocked Lead-Time 14 Weeks
|
Mouser Part No
538-1201190046
|
Molex
|
Sensor Junction Blocks M12 Sig, A-Coded, MPIS Ultra-Lock Passive Distribution Box, Stainless Steel, Top-Mount, 8 Port Ultra-Lock, PNP LED Indicators, 15.0m (49.2') Lg.
|
|
Non-Stocked Lead-Time 14 Weeks
|
|
Min.: 50
Mult.: 5
|
|
|
|
|
Sensor Junction Blocks M12 Sig, A-Coded, Safety MPIS Distribution Box, Top-Mount, 8 Ports - 5-Pole (4) and 8-Pole (4), PNP LED Indicators, WSOR Home Run Cable, 5.0m (16.4') Lg.
- 120248-0500
- Molex
-
5:
Rp5.145.135,70
-
Non-Stocked Lead-Time 22 Weeks
|
Mouser Part No
538-120248-0500
|
Molex
|
Sensor Junction Blocks M12 Sig, A-Coded, Safety MPIS Distribution Box, Top-Mount, 8 Ports - 5-Pole (4) and 8-Pole (4), PNP LED Indicators, WSOR Home Run Cable, 5.0m (16.4') Lg.
|
|
Non-Stocked Lead-Time 22 Weeks
|
|
Min.: 5
Mult.: 1
|
|
|
|
|
Sensor Junction Blocks M12 Sig, A-Coded, Safety MPIS Passive Distribution Box, 8 Poles, 8 Ports, PNP LED Indicators, WSOR Home Run Cable, 5.0m (16.4') Lg.
- 120248-0510
- Molex
-
5:
Rp6.473.569,56
-
Non-Stocked Lead-Time 22 Weeks
|
Mouser Part No
538-120248-0510
|
Molex
|
Sensor Junction Blocks M12 Sig, A-Coded, Safety MPIS Passive Distribution Box, 8 Poles, 8 Ports, PNP LED Indicators, WSOR Home Run Cable, 5.0m (16.4') Lg.
|
|
Non-Stocked Lead-Time 22 Weeks
|
|
Min.: 5
Mult.: 1
|
|
|
|
|
Sensor Junction Blocks M12 Sig, A-Coded, Safety MPIS Passive Distribution Box, Top-Mount, 4 Poles, 4 Ports, No LED Indicators, 4 Poles M12 Home Run Conn.
- 120248-0520
- Molex
-
1:
Rp1.647.103,88
-
Non-Stocked Lead-Time 28 Weeks
|
Mouser Part No
538-120248-0520
|
Molex
|
Sensor Junction Blocks M12 Sig, A-Coded, Safety MPIS Passive Distribution Box, Top-Mount, 4 Poles, 4 Ports, No LED Indicators, 4 Poles M12 Home Run Conn.
|
|
Non-Stocked Lead-Time 28 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Sensor Junction Blocks M12 Sig, A-Coded, MPIS Passive Distribution Box, Top-Mount, 4 Poles, 4 Ports, No LED Indicators, WSOR Home Run Cable, 5.0m (16.4') Lg.
- 1202480001
- Molex
-
1:
Rp2.843.079,62
-
Non-Stocked Lead-Time 16 Weeks
|
Mouser Part No
538-1202480001
|
Molex
|
Sensor Junction Blocks M12 Sig, A-Coded, MPIS Passive Distribution Box, Top-Mount, 4 Poles, 4 Ports, No LED Indicators, WSOR Home Run Cable, 5.0m (16.4') Lg.
|
|
Non-Stocked Lead-Time 16 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Sensor Junction Blocks M12 Sig, A-Coded, MPIS Passive Distribution Box, Top-Mount, 4 Poles, 4 Ports, PNP LED Indicators, WSOR Home Run Cable, 15.0m (49.2') Lg.
- 1202480006
- Molex
-
5:
Rp2.964.897,06
-
Non-Stocked Lead-Time 14 Weeks
|
Mouser Part No
538-1202480006
|
Molex
|
Sensor Junction Blocks M12 Sig, A-Coded, MPIS Passive Distribution Box, Top-Mount, 4 Poles, 4 Ports, PNP LED Indicators, WSOR Home Run Cable, 15.0m (49.2') Lg.
|
|
Non-Stocked Lead-Time 14 Weeks
|
|
Min.: 5
Mult.: 1
|
|
|
|
|
Sensor Junction Blocks Mini-Change MPIS, 3 Pole Female, 8 Ports w/ 10 Pole Male Conn.
- 1300600017
- Molex
-
1:
Rp8.605.558,22
-
Non-Stocked Lead-Time 15 Weeks
|
Mouser Part No
538-1300600017
|
Molex
|
Sensor Junction Blocks Mini-Change MPIS, 3 Pole Female, 8 Ports w/ 10 Pole Male Conn.
|
|
Non-Stocked Lead-Time 15 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Sensor Junction Blocks MPIS Mini-Change Passive Junction Box, Side Mount, 4 Ports, no LEDs, w/ Mini-Change 10 Pole Home Run Conn.
- 1300600043
- Molex
-
1:
Rp6.683.631,26
-
Non-Stocked Lead-Time 18 Weeks
|
Mouser Part No
538-1300600043
|
Molex
|
Sensor Junction Blocks MPIS Mini-Change Passive Junction Box, Side Mount, 4 Ports, no LEDs, w/ Mini-Change 10 Pole Home Run Conn.
|
|
Non-Stocked Lead-Time 18 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
AC Power Leads 10A C13 EU Line plug Locking Plug 400cm
- IL13-EU1-H05-3100-400
- TE Connectivity / Schaffner
-
25:
Rp419.573,02
-
Non-Stocked Lead-Time 43 Weeks
|
Mouser Part No
631-IL13EUH053100400
|
TE Connectivity / Schaffner
|
AC Power Leads 10A C13 EU Line plug Locking Plug 400cm
|
|
Non-Stocked Lead-Time 43 Weeks
|
|
Min.: 25
Mult.: 25
|
|
|
|
|
AC Power Leads IL13P-CH1-H05-3100-200
- IL13P-CH1-H05-3100-200
- TE Connectivity / Schaffner
-
100:
Rp314.083,52
-
Non-Stocked Lead-Time 43 Weeks
|
Mouser Part No
631-IL13PCH1H531
|
TE Connectivity / Schaffner
|
AC Power Leads IL13P-CH1-H05-3100-200
|
|
Non-Stocked Lead-Time 43 Weeks
|
|
Min.: 100
Mult.: 50
|
|
|
|
|
AC Power Leads IL13P-D-C14-H05-3100-200
- IL13P-D-C14-H05-3100-200
- TE Connectivity / Schaffner
-
100:
Rp337.749,86
-
Non-Stocked Lead-Time 21 Weeks
|
Mouser Part No
631-IL13PDC14H531200
|
TE Connectivity / Schaffner
|
AC Power Leads IL13P-D-C14-H05-3100-200
|
|
Non-Stocked Lead-Time 21 Weeks
|
|
Min.: 100
Mult.: 100
|
|
|
|
|
AC Power Leads IL13P-D-SE-H05-3100-200
- IL13P-D-SE-H05-3100-200
- TE Connectivity / Schaffner
-
100:
Rp281.244,18
-
Non-Stocked Lead-Time 21 Weeks
|
Mouser Part No
631-IL13PDSEH0531200
|
TE Connectivity / Schaffner
|
AC Power Leads IL13P-D-SE-H05-3100-200
|
|
Non-Stocked Lead-Time 21 Weeks
|
|
Min.: 100
Mult.: 100
|
|
|
|
|
AC Power Leads IL13P-D-SE-H05-3100-300
- IL13P-D-SE-H05-3100-300
- TE Connectivity / Schaffner
-
50:
Rp349.491,30
-
Non-Stocked Lead-Time 21 Weeks
|
Mouser Part No
631-IL13PDSEH0531300
|
TE Connectivity / Schaffner
|
AC Power Leads IL13P-D-SE-H05-3100-300
|
|
Non-Stocked Lead-Time 21 Weeks
|
|
Min.: 50
Mult.: 50
|
|
|
|
|
AC Power Leads IL13P-L-C14-H05-3100-200
- IL13P-L-C14-H05-3100-200
- TE Connectivity / Schaffner
-
100:
Rp335.731,80
-
Non-Stocked Lead-Time 21 Weeks
|
Mouser Part No
631-IL13PLC14H531200
|
TE Connectivity / Schaffner
|
AC Power Leads IL13P-L-C14-H05-3100-200
|
|
Non-Stocked Lead-Time 21 Weeks
|
|
Min.: 100
Mult.: 100
|
|
|
|
|
AC Power Leads IL13P-L-EU1-H05-3100-200
- IL13P-L-EU1-H05-3100-200
- TE Connectivity / Schaffner
-
50:
Rp412.051,16
-
Non-Stocked Lead-Time 21 Weeks
|
Mouser Part No
631-IL13PLEU1H531200
|
TE Connectivity / Schaffner
|
AC Power Leads IL13P-L-EU1-H05-3100-200
|
|
Non-Stocked Lead-Time 21 Weeks
|
|
Min.: 50
Mult.: 50
|
|
|
|
|
AC Power Leads IL13P-L-SE-H05-3100-200
- IL13P-L-SE-H05-3100-200
- TE Connectivity / Schaffner
-
100:
Rp277.758,44
-
Non-Stocked Lead-Time 21 Weeks
|
Mouser Part No
631-IL13PLSEH0531200
|
TE Connectivity / Schaffner
|
AC Power Leads IL13P-L-SE-H05-3100-200
|
|
Non-Stocked Lead-Time 21 Weeks
|
|
Min.: 100
Mult.: 100
|
|
|
|
|
AC Power Leads IL13P-R-C14-H05-3100-100
- IL13P-R-C14-H05-3100-100
- TE Connectivity / Schaffner
-
100:
Rp218.317,40
-
Non-Stocked Lead-Time 19 Weeks
|
Mouser Part No
631-IL13PRC14H531100
|
TE Connectivity / Schaffner
|
AC Power Leads IL13P-R-C14-H05-3100-100
|
|
Non-Stocked Lead-Time 19 Weeks
|
|
Min.: 100
Mult.: 100
|
|
|
|
|
AC Power Leads IL13P-R-EU1-H05-3100-200
- IL13P-R-EU1-H05-3100-200
- TE Connectivity / Schaffner
-
100:
Rp324.907,66
-
Non-Stocked Lead-Time 21 Weeks
|
Mouser Part No
631-IL13PREU1H531200
|
TE Connectivity / Schaffner
|
AC Power Leads IL13P-R-EU1-H05-3100-200
|
|
Non-Stocked Lead-Time 21 Weeks
|
|
Min.: 100
Mult.: 100
|
|
|
|
|
AC Power Leads IL13P-R-EU1-H05-3100-300
- IL13P-R-EU1-H05-3100-300
- TE Connectivity / Schaffner
-
50:
Rp382.881,02
-
Non-Stocked Lead-Time 21 Weeks
|
Mouser Part No
631-IL13PREU1H531300
|
TE Connectivity / Schaffner
|
AC Power Leads IL13P-R-EU1-H05-3100-300
|
|
Non-Stocked Lead-Time 21 Weeks
|
|
Min.: 50
Mult.: 50
|
|
|
|
|
AC Power Leads IL13P-R-UK1-H05-3100-300
- IL13P-R-UK1-H05-3100-300
- TE Connectivity / Schaffner
-
50:
Rp433.699,44
-
Non-Stocked Lead-Time 21 Weeks
|
Mouser Part No
631-IL13PRUK1H531300
|
TE Connectivity / Schaffner
|
AC Power Leads IL13P-R-UK1-H05-3100-300
|
|
Non-Stocked Lead-Time 21 Weeks
|
|
Min.: 50
Mult.: 50
|
|
|
|
|
AC Power Leads IL13P-U-C14-H05-3100-200
- IL13P-U-C14-H05-3100-200
- TE Connectivity / Schaffner
-
100:
Rp335.364,88
-
Non-Stocked Lead-Time 21 Weeks
|
Mouser Part No
631-IL13PUC14H531200
|
TE Connectivity / Schaffner
|
AC Power Leads IL13P-U-C14-H05-3100-200
|
|
Non-Stocked Lead-Time 21 Weeks
|
|
Min.: 100
Mult.: 100
|
|
|
|
|
AC Power Leads IL13P-U-EU1-H05-3100-200
- IL13P-U-EU1-H05-3100-200
- TE Connectivity / Schaffner
-
100:
Rp329.861,08
-
Non-Stocked Lead-Time 21 Weeks
|
Mouser Part No
631-IL13PUEU1H531200
|
TE Connectivity / Schaffner
|
AC Power Leads IL13P-U-EU1-H05-3100-200
|
|
Non-Stocked Lead-Time 21 Weeks
|
|
Min.: 100
Mult.: 100
|
|
|
|
|
AC Power Leads IL13P-U-SE-H05-3100-300
- IL13P-U-SE-H05-3100-300
- TE Connectivity / Schaffner
-
50:
Rp354.628,18
-
Non-Stocked Lead-Time 21 Weeks
|
Mouser Part No
631-IL13PUSEH0531300
|
TE Connectivity / Schaffner
|
AC Power Leads IL13P-U-SE-H05-3100-300
|
|
Non-Stocked Lead-Time 21 Weeks
|
|
Min.: 50
Mult.: 50
|
|
|