PESS Series Rectangular Cable Assemblies

Results: 604
Select Image Part # Mfr. Description Datasheet Availability Pricing (IDR) Filter the results in the table by unit price based on your quantity. Qty. RoHS ECAD Model Series Product Connector End A Connector End A Pin Count Connector End B Connector End B Pin Count Gender Cable Length Wire Gauge - AWG Current Rating Jacket Colour Packaging
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 12 Weeks
Rp1.002.975,82
Rp987.381,72
Rp966.650,74
Rp948.304,74
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 12 Weeks
Rp2.167.029,52
Rp2.097.131,26
Rp2.096.580,88
Rp2.071.079,94
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 6 Weeks
Rp706.871,38
Rp694.029,18
Rp682.104,28
Rp660.089,08
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 6 Weeks
Rp1.695.904,24
Rp1.626.189,44
Rp1.624.354,84
Rp1.605.091,54
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 6 Weeks
Rp1.752.776,84
Rp1.680.677,06
Rp1.679.025,92
Rp1.658.845,32
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 6 Weeks
Rp669.812,46
Rp668.895,16
Rp652.934,14
Rp638.073,88
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 6 Weeks
Rp817.130,84
Rp806.490,16
Rp796.583,32
Rp778.420,78
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 6 Weeks
Rp890.514,84
Rp872.352,30
Rp855.473,98
Rp738.976,88
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 6 Weeks
Rp921.152,66
Rp907.026,24
Rp887.946,40
Rp871.251,54
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 6 Weeks
Rp988.299,02
Rp972.888,38
Rp952.340,86
Rp934.361,78
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 6 Weeks
Rp988.299,02
Rp972.888,38
Rp952.340,86
Rp934.361,78
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 6 Weeks
Rp833.825,70
Rp816.580,46
Rp801.169,82
Rp689.809,60
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250" PowerStrip(TM)/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp598.996,90
Rp598.079,60
Rp581.568,20
Rp566.341,02
Min.: 1
Mult.: 1
PESS
Samtec Rectangular Cable Assemblies .250" PowerStrip(TM)/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.181.665,86
Rp1.164.604,08
Rp1.118.555,62
Rp1.117.087,94
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp958.761,96
Rp937.664,06
Rp925.005,32
Rp906.842,78
Min.: 1
Mult.: 1
PESS
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp2.637.604,42
Rp2.530.647,24
Rp2.528.812,64
Rp2.497.991,36
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp958.945,42
Rp945.002,46
Rp925.555,70
Rp907.576,62
Min.: 1
Mult.: 1
PESS Discrete Wire Cable Assemblies Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.441.078,30
Rp1.378.334,98
Rp1.375.950,00
Rp1.207.900,64
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.847.442,20
Rp1.774.608,58
Rp1.774.241,66
Rp1.752.593,38
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp2.244.816,56
Rp2.156.205,38
Rp2.155.471,54
Rp2.129.420,22
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.153.963,40
Rp1.129.196,30
Rp1.091.770,46
Rp1.090.486,24
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.250.463,36
Rp1.232.300,82
Rp1.183.500,46
Rp1.182.032,78
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.308.069,80
Rp1.280.000,42
Rp1.237.621,16
Rp1.236.153,48
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.313.023,22
Rp1.293.759,92
Rp1.242.391,12
Rp1.241.106,90
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp3.035.529,16
Rp3.013.147,04
Rp3.012.413,20
Rp2.963.062,46
Min.: 1
Mult.: 1
PESS Bulk