Samtec PESS Series Rectangular Cable Assemblies

Results: 604
Select Image Part # Mfr. Description Datasheet Availability Pricing (IDR) Filter the results in the table by unit price based on your quantity. Qty. RoHS ECAD Model Series Product Connector End A Connector End A Pin Count Connector End B Connector End B Pin Count Gender Cable Length Wire Gauge - AWG Current Rating Jacket Colour Packaging
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.427.318,80
Rp1.364.758,94
Rp1.363.107,80
Rp1.192.856,92
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.432.455,68
Rp1.373.565,02
Rp1.372.097,34
Rp1.355.769,40
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.647.837,72
Rp1.580.140,98
Rp1.578.306,38
Rp1.559.593,46
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.656.643,80
Rp1.588.763,60
Rp1.586.929,00
Rp1.568.032,62
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.660.129,54
Rp1.590.781,66
Rp1.587.295,92
Rp1.569.316,84
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.856.248,28
Rp1.774.975,50
Rp1.772.590,52
Rp1.551.521,22
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp825.570,00
Rp814.745,86
Rp800.069,06
Rp786.309,56
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp879.690,70
Rp865.197,36
Rp847.034,82
Rp831.073,80
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp901.705,90
Rp888.863,70
Rp871.068,08
Rp854.923,60
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp2.636.503,66
Rp2.536.151,04
Rp2.535.050,28
Rp2.505.696,68
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp949.038,58
Rp933.261,02
Rp913.630,80
Rp896.385,56
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp956.560,44
Rp942.984,40
Rp924.271,48
Rp907.026,24
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.007.195,40
Rp990.133,62
Rp969.402,64
Rp951.056,64
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.020.771,44
Rp1.003.709,66
Rp982.428,30
Rp964.082,30
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.025.357,94
Rp1.008.112,70
Rp986.831,34
Rp968.301,88
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.025.357,94
Rp1.008.112,70
Rp986.831,34
Rp968.301,88
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.057.096,52
Rp1.039.484,36
Rp1.017.469,16
Rp998.389,32
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.065.352,22
Rp1.041.318,96
Rp1.028.293,30
Rp1.008.296,16
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.098.191,56
Rp1.079.662,10
Rp1.056.913,06
Rp1.036.915,92
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.101.860,76
Rp1.076.910,20
Rp1.063.517,62
Rp1.042.970,10
Min.: 1
Mult.: 1
PESS Discrete Wire Cable Assemblies
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.128.095,54
Rp1.109.199,16
Rp1.065.352,22
Rp1.064.068,00
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.170.291,34
Rp1.143.873,10
Rp1.107.731,48
Rp1.106.263,80
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.175.795,14
Rp1.159.283,74
Rp1.114.886,42
Rp1.113.602,20
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.276.881,60
Rp1.258.719,06
Rp1.210.652,54
Rp1.209.368,32
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.280.183,88
Rp1.258.535,60
Rp1.208.817,94
Rp1.207.533,72
Min.: 1
Mult.: 1
PESS Bulk