Samtec PESS Series Rectangular Cable Assemblies

Results: 604
Select Image Part # Mfr. Description Datasheet Availability Pricing (IDR) Filter the results in the table by unit price based on your quantity. Qty. RoHS ECAD Model Series Product Connector End A Connector End A Pin Count Connector End B Connector End B Pin Count Gender Cable Length Wire Gauge - AWG Current Rating Jacket Colour Packaging
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.861.568,62
Rp1.790.569,60
Rp1.790.202,68
Rp1.769.104,78
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.205.515,66
Rp1.189.921,56
Rp1.152.312,26
Rp982.795,22
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.205.332,20
Rp1.189.921,56
Rp1.152.312,26
Rp973.805,68
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.344.945,26
Rp1.314.490,90
Rp1.273.028,94
Rp1.271.377,80
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.395.029,84
Rp1.371.546,96
Rp1.317.426,26
Rp1.315.775,12
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.372.280,80
Rp1.354.485,18
Rp1.307.335,96
Rp1.305.684,82
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.482.540,26
Rp1.425.851,12
Rp1.425.484,20
Rp1.408.789,34
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.590.414,74
Rp1.525.286,44
Rp1.523.451,84
Rp1.505.472,76
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.590.414,74
Rp1.525.286,44
Rp1.523.451,84
Rp1.505.472,76
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp2.021.178,82
Rp1.938.254,90
Rp1.936.053,38
Rp1.912.937,42
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp2.111.808,06
Rp2.025.214,94
Rp2.022.829,96
Rp1.998.796,70
Min.: 1
Mult.: 1
PESS 1 m Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp2.128.686,38
Rp2.041.359,42
Rp2.039.157,90
Rp2.014.757,72
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.262.204,80
Rp1.235.603,10
Rp1.195.608,82
Rp1.194.324,60
Min.: 1
Mult.: 1
PESS Discrete Wire Cable Assemblies Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.308.803,64
Rp1.279.266,58
Rp1.238.721,92
Rp1.237.254,24
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.282.201,94
Rp1.265.690,54
Rp1.225.696,26
Rp1.034.897,86
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.391.911,02
Rp1.334.854,96
Rp1.333.203,82
Rp1.317.426,26
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.445.848,26
Rp1.386.407,22
Rp1.384.756,08
Rp1.368.428,14
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.447.132,48
Rp1.383.838,78
Rp1.382.004,18
Rp1.209.551,78
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.500.886,26
Rp1.435.024,12
Rp1.433.189,52
Rp1.254.499,48
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.550.787,38
Rp1.486.943,30
Rp1.485.475,62
Rp1.467.680,00
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.607.293,06
Rp1.541.247,46
Rp1.539.412,86
Rp1.521.250,32
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.496.666,68
Rp1.444.197,12
Rp1.443.646,74
Rp1.428.236,10
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.504.372,00
Rp1.453.003,20
Rp1.452.269,36
Rp1.449.334,00
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.598.303,52
Rp1.532.624,84
Rp1.530.973,70
Rp1.512.811,16
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.598.303,52
Rp1.532.624,84
Rp1.530.973,70
Rp1.512.811,16
Min.: 1
Mult.: 1
PESS Bulk