Samtec PESS Series Rectangular Cable Assemblies

Results: 604
Select Image Part # Mfr. Description Datasheet Availability Pricing (IDR) Filter the results in the table by unit price based on your quantity. Qty. RoHS ECAD Model Series Product Connector End A Connector End A Pin Count Connector End B Connector End B Pin Count Gender Cable Length Wire Gauge - AWG Current Rating Jacket Colour Packaging
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.670.036,38
Rp1.601.422,34
Rp1.599.587,74
Rp1.580.691,36
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.670.036,38
Rp1.601.422,34
Rp1.599.587,74
Rp1.580.691,36
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.707.829,14
Rp1.653.708,44
Rp1.396.314,06
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.739.567,72
Rp1.665.266,42
Rp1.662.697,98
Rp1.462.359,66
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.849.460,26
Rp1.773.507,82
Rp1.771.489,76
Rp1.750.391,86
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.885.418,42
Rp1.807.998,30
Rp1.805.980,24
Rp1.784.515,42
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.880.098,08
Rp1.807.264,46
Rp1.806.163,70
Rp1.784.882,34
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp8.085.265,66
Rp8.077.193,42
Rp8.074.258,06
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp2.028.884,14
Rp1.945.593,30
Rp1.943.391,78
Rp1.920.275,82
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp2.387.731,90
Rp2.289.580,80
Rp2.287.195,82
Rp2.259.860,28
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp2.567.155,78
Rp2.566.972,32
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp2.746.579,66
Rp2.633.751,76
Rp2.630.999,86
Rp2.599.444,74
Min.: 1
Mult.: 1
PESS
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp3.293.473,92
Rp3.293.290,46
Rp3.276.595,60
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp3.987.136,18
Rp3.970.074,40
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp5.507.285,74
Rp5.432.800,98
Rp5.430.599,46
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.394.296,00
Rp1.345.679,10
Rp1.345.128,72
Rp1.330.818,84
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.464.561,18
Rp1.413.742,76
Rp1.413.008,92
Rp1.398.148,66
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.464.010,80
Rp1.412.825,46
Rp1.412.458,54
Rp1.397.414,82
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.636.830,12
Rp1.569.683,76
Rp1.568.032,62
Rp1.549.319,70
Min.: 1
Mult.: 1
PESS
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.604.908,08
Rp1.554.089,66
Rp1.313.390,14
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.788.001,16
Rp1.719.754,04
Rp1.719.387,12
Rp1.699.206,52
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp1.852.212,16
Rp1.776.259,72
Rp1.774.241,66
Rp1.753.143,76
Min.: 1
Mult.: 1
PESS Bulk
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Rp2.497.991,36
Rp2.395.620,68
Rp2.392.868,78
Rp2.364.432,48
Min.: 1
Mult.: 1
PESS Bulk
Samtec PESS-04-10-T-16.00-DR-NDS
Samtec Rectangular Cable Assemblies Non-Stocked Lead-Time 7 Weeks
Rp603.950,32
Rp573.679,42
Rp449.293,54
Rp420.123,40
Min.: 1
Mult.: 1
PESS
Samtec PESS-02-10-T-20.00-DR-NUS
Samtec Rectangular Cable Assemblies .250 PowerStrip/40 A Single Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 6 Weeks
Rp432.231,76
Rp430.764,08
Rp430.580,62
Rp401.777,40
Min.: 1
Mult.: 1
PESS